Quantity Surveying Basics Quiz

Authored by CBE QS

Architecture

Professional Development

Used 6+ times

Quantity Surveying Basics Quiz
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is quantification in the context of construction works?

Determining the project timeline

Calculating the total cost of a project

Converting drawn information into descriptions and quantities

Selecting the construction materials

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is quantification important in construction works?

To determine the project timeline

To calculate the total cost of a project

To assess the likely out-turn cost of the works

To select the construction materials

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of quantification during the pre-contract stage?

To assess the likely out-turn cost of the works

To determine the project timeline

To prepare for the construction phase

To use the data for feasibility study and budgeting

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the standard method of measurement (SMM) in construction?

A project management tool

A cost estimating technique

A type of construction material

A document with a set of measurement rules

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is the standard method of measurement (SMM) important in construction?

To determine the project timeline

To select the construction materials

To promote transparency and clear understanding

To calculate the total cost of a project

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the difference between price, cost, and value in construction?

Price is the amount paid, cost is the total input, and value is the payment received

Price is the total input, cost is the amount paid, and value is the payment received

Price is the payment received, cost is the amount paid, and value is the total input

Price is the payment received, cost is the total input, and value is the amount paid

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of cost estimate is developed during the visibility or concept phase of a project?

Concept cost estimate

Preliminary cost estimate

Definitive cost estimate

Schematic cost estimate

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?