Electrical capstone prep part 1

Electrical capstone prep part 1

Professional Development

51 Qs

quiz-placeholder

Similar activities

RME_Chapter 1

RME_Chapter 1

Professional Development

50 Qs

EMA_EE3109FP_Revision paper 1

EMA_EE3109FP_Revision paper 1

Professional Development

50 Qs

Junior Associates 2023 Quiz No. 01

Junior Associates 2023 Quiz No. 01

Professional Development

54 Qs

Attendance 002 2/1

Attendance 002 2/1

Professional Development

55 Qs

PMI-CP_M3_Contract and Risk

PMI-CP_M3_Contract and Risk

Professional Development

50 Qs

[Demo] Mock Online - CFA level 1

[Demo] Mock Online - CFA level 1

Professional Development

46 Qs

TAXATION REVIEW

TAXATION REVIEW

Professional Development

50 Qs

Cha_RA 9266

Cha_RA 9266

Professional Development

47 Qs

Electrical capstone prep part 1

Electrical capstone prep part 1

Assessment

Quiz

Professional Development

Professional Development

Easy

Created by

Jenna A

Used 10+ times

FREE Resource

51 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

As the temperature of a conductor increases, its resistance will?

increase

decrease

remain the same

reach a maximum

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A voltmeter connected between points of equal potential will indicate?

a short circuit

a max reading on the meter

a zero reading on the meter

a negative reading

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Using As/NZS3012, at a construction site how are construction wiring systems distinguished or marked from permanent wiring systems?

using sheaths of different colour

iridescent yellow tape spaced not exceeding 5m

marked with the words 'construction wiring'

all of the above

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Using AS/NZS3012 clause 2.6.3

When taking power from temporary construction switchboard, what type of lead should be used?

heavy duty sheath

TPS

any

building wire

5.

FILL IN THE BLANK QUESTION

5 mins • 1 pt

Using AS/NZS3000

What would be the reason for an area being classified as a hazardous area if electrical equipment is to be installed? Provide the clause

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A likely cause of reported electrical shocks (tingles) from the metallic water system in premises with a MEN earthing system is

an open cct in the neutral conductor supplying the water heater

a short cct to earth of a sub-cct active conductor

a high resistance in consumer's supply neutral conductor

a short cct in a cub-cct protected by a re-wireable fuse

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The maximum resistance of an earth conductor accompanying a sub-mains cct shall be

< or = to 0.5ohm

< or = to 2ohm

< or = to 1Mohm

low enough to permit the passage of current necessary to operate the overcurrent protective device

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?