
2022PC_Board Exam part1
Authored by J Lang
Professional Development
Professional Development
Used 3+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
30 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
1. __________ are fittings or device designed and constructed to provide a liquid sealed which prevent the back passage of the air without materially affecting the flow of sewage of the water through it.
2.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
2. What is the weight of one cubic meter of air?
3.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
3. What is the maximum pressure (in psi) after which a pressure regulator should be installed?
4.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
4. Oakum is a _________ soaked in oil or tar to make it waterproofed.
5.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
5. A water Distribution system is:
6.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
6. What is the minimum distance between the floor level and the yoke vent connection with the vent stack?
7.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
7. What kind of pipe when subjected to a hammer test, the zinc flakes off?
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?