Phase 1: Processes PP8

Phase 1: Processes PP8

Professional Development

5 Qs

quiz-placeholder

Similar activities

Issues when constructing

Issues when constructing

Professional Development

9 Qs

Rainwater Systems QuizL3P2U8,4.2

Rainwater Systems QuizL3P2U8,4.2

Professional Development

7 Qs

Cold Water Systems Quiz l2 2.7 LO

Cold Water Systems Quiz l2 2.7 LO

Professional Development

10 Qs

Ph1 CPT bolts and fixings

Ph1 CPT bolts and fixings

Professional Development

10 Qs

Cold Water Systems Quiz L3P2u5,2.6

Cold Water Systems Quiz L3P2u5,2.6

Professional Development

10 Qs

Fittings Quiz Phase 1 PP1

Fittings Quiz Phase 1 PP1

Professional Development

8 Qs

Phase 1: Processes PP8

Phase 1: Processes PP8

Assessment

Quiz

Architecture

Professional Development

Hard

Created by

Steve Watson

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the clipping distances for 22mm copper pipework in the vertical direction?

1.2m

1.8m

3.0m

2.4m

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of screwdriver is required for Pozi drive screws?

Torx screwdriver

Phillips screwdriver

Pozi drive screwdriver

Flat head screwdriver

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of pipe clip is suitable for supporting low carbon steel pipework?

Cast iron munsen ring

Plastic PP

Brass munsen ring

Copper saddle

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the clipping distance for 1" low carbon steel pipework in the horizontal direction?

1.8m

2.4m

3.0m

3.6m

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What additional feature do Pozi drive screws have in their head compared to Phillips countersunk screws?

Extra length

Round head

Additional grooves for greater grip

Different gauge