Phase 1: Processes PP8

Phase 1: Processes PP8

Professional Development

5 Qs

quiz-placeholder

Similar activities

Oil Tank Installation P3L3U11,AC1.6P15.15

Oil Tank Installation P3L3U11,AC1.6P15.15

Professional Development

9 Qs

Phase 1: Processes PP8

Phase 1: Processes PP8

Assessment

Quiz

Architecture

Professional Development

Practice Problem

Hard

Created by

Steve Watson

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the clipping distances for 22mm copper pipework in the vertical direction?

1.2m

1.8m

3.0m

2.4m

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of screwdriver is required for Pozi drive screws?

Torx screwdriver

Phillips screwdriver

Pozi drive screwdriver

Flat head screwdriver

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of pipe clip is suitable for supporting low carbon steel pipework?

Cast iron munsen ring

Plastic PP

Brass munsen ring

Copper saddle

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the clipping distance for 1" low carbon steel pipework in the horizontal direction?

1.8m

2.4m

3.0m

3.6m

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What additional feature do Pozi drive screws have in their head compared to Phillips countersunk screws?

Extra length

Round head

Additional grooves for greater grip

Different gauge