
End of pathway carpentry WFHS
Authored by Jacob Williams
Architecture
12th Grade
Used 8+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
18 questions
Show all answers
1.
FILL IN THE BLANK QUESTION
1 min • 1 pt
A program that requires a trainee to demonstrate the ability to perform job related tasks is known as a(n) ______ program
2.
FILL IN THE BLANK QUESTION
1 min • 1 pt
Job before master carpenter
3.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
A frame for making window and door openings is a
buck frame
box frame
an A frame
j frame
4.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
the term s dry means that lumber contains _______ moisture
no more than 19%
no more 25%
less than 5%
50 percent
5.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
A type of cut made with a circular saw
A rip cut or pocket cut
6.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
The lines on drawings used to indicate an area that has been cut away and shown in a section view are called what lines?
Cutting lines or cutting Planes
7.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
They are used to prevent concrete from freezing before it cures
Concrete blankets or expanded plastic cell slabs
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?