Stud Pack Dreamhouse Build Quiz #2

Stud Pack Dreamhouse Build Quiz #2

12th Grade

10 Qs

quiz-placeholder

Similar activities

Famous Landmarks

Famous Landmarks

5th - 12th Grade

10 Qs

Building Materials

Building Materials

10th Grade - Professional Development

15 Qs

NIE WIEM

NIE WIEM

KG - Professional Development

10 Qs

Spring 2024 - Unit 3 Review Quiz (most missed q's)

Spring 2024 - Unit 3 Review Quiz (most missed q's)

9th - 12th Grade

15 Qs

Mechanical Drawing - 1.3.2.

Mechanical Drawing - 1.3.2.

8th - 12th Grade

15 Qs

2022 STEAM Week Engineering Quiz

2022 STEAM Week Engineering Quiz

7th - 12th Grade

10 Qs

Perspektywa

Perspektywa

9th - 12th Grade

12 Qs

Genesis 13-15

Genesis 13-15

5th Grade - Professional Development

10 Qs

Stud Pack Dreamhouse Build Quiz #2

Stud Pack Dreamhouse Build Quiz #2

Assessment

Quiz

Architecture

12th Grade

Practice Problem

Hard

Created by

John Purdum

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the 2x4 installed on the flat on either side of the 2x2?

To create a decorative ceiling

To provide support for the post base and the pieces running parallel and towards the corners

To support the decking material

To act as a ledger for the roof system

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the chalk line that was popped from the top of the beam to the other end?

To mark the position for the ledger that will support the roof system

To measure the length of the joist for the roof system

To indicate the location for the decorative ceiling installation

To guide the installation of the post base

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the length of the joist used for the roof system?

86.5 inches

85 inches

94 inches

12.38 inches

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the 2x12 used for the top of the roof?

To provide support for the post base

To support the decking material

To act as a ledger for the roof system

To create the slope part of the roof

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the method used to align and adjust the five rafters together?

Using a circular saw to cut them individually

Using a level to adjust the height

Using a planer to dial them in

Using a chalk line to mark the alignment

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the purpose of the 2x4 Ledger installed on the building?

To guide the installation of the post base

To provide support for the ceiling joist

To create a decorative ceiling

To act as a ledger for the roof system

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the length of the rise for the roof rafter?

86.5 inches

12.38 inches

85 inches

94 inches

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?