Plumbing QBank 5

Plumbing QBank 5

Professional Development

15 Qs

quiz-placeholder

Similar activities

L2 Common Plumbing Processes PT1

L2 Common Plumbing Processes PT1

University - Professional Development

10 Qs

AURLTD104

AURLTD104

Professional Development

10 Qs

LCS pipework level 1 7202 unit 111

LCS pipework level 1 7202 unit 111

Professional Development

16 Qs

6035 | Drainage systems | LO1.1

6035 | Drainage systems | LO1.1

Professional Development

13 Qs

L3 AP Cold water P2

L3 AP Cold water P2

University - Professional Development

17 Qs

Test de rentrée 3e

Test de rentrée 3e

Professional Development

13 Qs

PSBMI HD15

PSBMI HD15

Professional Development

20 Qs

Cold Water Systems LO2

Cold Water Systems LO2

Professional Development

13 Qs

Plumbing QBank 5

Plumbing QBank 5

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

J Lang

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. Which material ultimately seals a caulked or bell and spigot joint?


Cement

Oakum

Pig lead

Coal tar

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. What do you call the process in which all types of iron-based metals rust?


Oxidation

Pit corrosion

Material breakdown

Tuberculation

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. Which pipe support is recommended in holding a single horizontal soil or waste

branch?


Clevis

Bracket

Trapeze

Clamp hanger

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. Which of these pipes is measured by its outside diameter?

Galvanized steel pipe

Cast iron pipe

Copper pipe

Concrete pipe

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. Pressure loss in pipe due to its interior surface is attributed to what factor?

Friction loss

Static pressure

Dynamic head

Water flow

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. Which plastic pipe is normally oval in cross section and is denoted by it outside

diameter?

PP (Polypropylene)

CPVC (Chlorinated polyvinyl

chloride)

PB (Polybutylene)

SR (Styrene rubber)

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7. Ventilating system is essential in sanitary drainage system. Providing such system prevents      .


Backpressure

Siphonage

Backflow

All of these

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?