What is the PRIMARY goal of conducting a risk assessment in safety and health?
OSH Risk Assessment Review

Quiz
•
Science
•
University
•
Hard
Arvind B
Used 12+ times
FREE Resource
40 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
To assign blame for past accidents
To fulfill legal requirements
To proactively identify and prioritize potential hazards
To provide entertainment and team-building activities
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following is NOT a typical component of evaluating the likelihood of a hazard occurring?
Historical data of similar incidents
Frequency of exposure to the hazard
Presence of existing control measures
Emotional impact of the potential consequences
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
A comprehensive risk assessment typically involves
consulting with a single expert who delivers a final report
relying solely on historical data and past experiences
gathering input from stakeholders and relevant specialists
focusing solely on quantifiable risks and ignoring qualitative factors
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following BEST defines resilience in the context of safety management?
Ability to prevent accidents and incidents
Capacity to adapt and recover quickly from safety-related disruptions
Strict adherence to safety regulations and procedures
Presence of robust emergency response plans
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The existence of tolerable risks in a workplace implies
Complete absence of any safety procedures or controls
Acceptance of some level of unavoidable harm within defined limits
Failure of the safety management system to adequately manage risks
An unsafe and irresponsible approach to workplace safety
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The primary goal of the ALARA principle is to
eliminate all risks entirely
minimize risks to an acceptable level while considering practicability
implement the most expensive control measures
follow legal requirements
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The primary purpose of the PDCA cycle in safety management is to
Continuously improve safety performance by proactively managing risks
Eliminate all accidents and incidents entirely
React to and investigate incidents after they occur
Comply with regulatory safety requirements only
Create a free account and access millions of resources
Similar Resources on Quizizz
40 questions
Laboratory Safety Quiz

Quiz
•
9th Grade - University
41 questions
POPH192 quiz pt.2 set me free

Quiz
•
University
37 questions
AS 220 Chapters 4,6,8,9,12

Quiz
•
12th Grade - University
40 questions
Post Test GMP, FSSC 22000 & BRC GS

Quiz
•
1st Grade - Professio...
41 questions
Food Bowl #6

Quiz
•
University
42 questions
Envi Sci Long Test

Quiz
•
University
38 questions
Chapter 10: Cody Study Guide

Quiz
•
University
35 questions
Ch. 37- Concepts of Care for Paitents with Hematologic Problems

Quiz
•
University
Popular Resources on Quizizz
15 questions
Multiplication Facts

Quiz
•
4th Grade
25 questions
SS Combined Advisory Quiz

Quiz
•
6th - 8th Grade
40 questions
Week 4 Student In Class Practice Set

Quiz
•
9th - 12th Grade
40 questions
SOL: ILE DNA Tech, Gen, Evol 2025

Quiz
•
9th - 12th Grade
20 questions
NC Universities (R2H)

Quiz
•
9th - 12th Grade
15 questions
June Review Quiz

Quiz
•
Professional Development
20 questions
Congruent and Similar Triangles

Quiz
•
8th Grade
25 questions
Triangle Inequalities

Quiz
•
10th - 12th Grade