Safety Gap Closure: Labour Safety 2

Safety Gap Closure: Labour Safety 2

Professional Development

8 Qs

quiz-placeholder

Similar activities

Let's have some fun!!

Let's have some fun!!

Professional Development

12 Qs

Wildlife Safety

Wildlife Safety

6th Grade - Professional Development

11 Qs

safety rules

safety rules

KG - Professional Development

9 Qs

Science Safety

Science Safety

4th Grade - Professional Development

7 Qs

Safety Data Sheet training PERINTOSH

Safety Data Sheet training PERINTOSH

Professional Development

10 Qs

Food Safety - True or False

Food Safety - True or False

Professional Development

12 Qs

RADIATION SAFETY & INFECTION CONTROL

RADIATION SAFETY & INFECTION CONTROL

Professional Development

5 Qs

Dobsinai jégbarlang

Dobsinai jégbarlang

Professional Development

8 Qs

Safety Gap Closure: Labour Safety 2

Safety Gap Closure: Labour Safety 2

Assessment

Quiz

Science

Professional Development

Hard

Created by

Ghadafi Ismail

Used 3+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the fall protection hierarchy?

  1. 1. Eliminate 2. Prevent 3. Restrain 4. Arrest

  1. 1. Elimination 2. Substitution 3. Engineering Control 4. Administrative Control 5. PPE

  1. 1. Absorber 2. Life line 3. Hook 4. Fall arrestor

  1. 1. Arrest 2. Prevent 3. Body Harness 4. Absorber

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At what minimum height should the 'absorber' harness be worn

>6m

>2m

>1.5m

>8m

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Above what height is required to wear body harness?

>1.5m

>2m

>3m

>4m

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Lifting plan shall be reviewed and discuss with:

Area owner & ENG/ MTCE

Area Owner, ENG/MTCE, SHEQ,

Area Owner, ENG/MTCE, SHEQ, Lifting Supervisor

Area Owner, ENG/MTCE, SHEQ, Lifting Supervisor, Rigger, Signal Man

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fencing and guarding of rotating equipment is required by

OSHA Act 1994

CLASS Regulation 2013

FMA 1967

Surat Arahan Ketua Pengarah DOSH

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

The following personnel is required to conduct crane lifting activity (more than one answer)

Crane operator

Lifting supervisor

Signalman

Rigger

Outrigger

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Based on the given crane chart, determine the suitable boom length of the crane

30.5m

23.5m

16.5m

9.5m

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Calculate the lifting capacity ratio using the given load chart and information given below:

a) Max crane capacity = 25T
b) boom radius = 13m
c) boom length = 23m

d) Total load inlcuding safety factor = 2000kg

47%

57%

67%

75%