Train Bogies and Wheelsets

Train Bogies and Wheelsets

5th Grade

10 Qs

quiz-placeholder

Similar activities

LIGHT CLASS 4

LIGHT CLASS 4

3rd - 5th Grade

8 Qs

Energy

Energy

5th - 12th Grade

10 Qs

SOUND, LIGHT

SOUND, LIGHT

4th - 5th Grade

11 Qs

electricity and circut

electricity and circut

5th Grade - Professional Development

13 Qs

Energy Test Review

Energy Test Review

5th - 8th Grade

10 Qs

Pulleys and levers

Pulleys and levers

5th Grade

10 Qs

Electromagnetic Induction

Electromagnetic Induction

1st - 5th Grade

15 Qs

Bab 6 Cahaya

Bab 6 Cahaya

5th Grade

15 Qs

Train Bogies and Wheelsets

Train Bogies and Wheelsets

Assessment

Quiz

Physics

5th Grade

Practice Problem

Hard

Created by

Aii Aii

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

They allow the vehicle to pass through tight curves without using as many axles.

Articulated Bogies

Non-articulated Bogies

Bolster Bogies

Bolsterless Bogies

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How do on-track tests contribute to the validation of a bogie's performance?

By testing the train's horn sound

By checking the color of the train

By confirming the bogie's stress levels during real operations

By measuring the train's fuel consumption

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary focus of the Validation Phase?

Assessing the train's exterior aesthetics

Achieving a perfect match between predicted and measured results

Confirming that computer predictions align well with real-world tests

Setting strict rules for differences in strain measurements

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This is one of the train bogie‘s designing methods that is done by putting the train on actual train tracks to measure how much stress the bogie experiences during actual train operations.

Calculations

Technical Specification

Acceptance Program

On-Track Test

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Odd one out for Suspension Gear

Coil Spring

Air Spring

Disc Spring

Leaf Spring

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the EN13749, this is the first stage of the design process that involves the establishing of responsibilities for both the supplier and the client with regard to the development and manufacturing of new railway bogies.

Acceptance Program

Calculation

Testing Programs

Technical Specification

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is a chassis carrying wheels attached to the train, serving as a modular sub-assembly of wheels and axles to provide some degree of cushioning against the shocks.

Bearings

Bolster

Suspension

Bogie Frame

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?