ALE Review - Building Utilities Quiz 5

ALE Review - Building Utilities Quiz 5

University

30 Qs

quiz-placeholder

Similar activities

Konstruksi Utilitas Bangunan

Konstruksi Utilitas Bangunan

3rd Grade - University

25 Qs

UTS Bahasa Inggris

UTS Bahasa Inggris

University

25 Qs

RA 9266 & BP 344 QUIZ

RA 9266 & BP 344 QUIZ

University

30 Qs

BLT 132 QUIZ#1

BLT 132 QUIZ#1

University

30 Qs

ACC '21-'22 FN QUIZ# 1

ACC '21-'22 FN QUIZ# 1

University

30 Qs

Electrical and Plumbing Quiz

Electrical and Plumbing Quiz

University

35 Qs

BUILDING UTILITIES PART 1_PLUMBING

BUILDING UTILITIES PART 1_PLUMBING

University

30 Qs

COLD WATER DISTRIBUTION SYSTEM LINE

COLD WATER DISTRIBUTION SYSTEM LINE

University

25 Qs

ALE Review - Building Utilities Quiz 5

ALE Review - Building Utilities Quiz 5

Assessment

Quiz

Architecture

University

Medium

Created by

Black Knight

Used 18+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Dampers are installed inside air boot fitting to?

To remove excess airflow

To regulate the amount of cool air for even distribution to outlets

To stop airflow

To redirect airflow

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A variable air volume (VAV) unit is used for?

Cooling a room

Cooling several rooms for one (1) unit

Cooling indoor parking areas

Cooling mechanical equipment

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A type of air register used in ceiling with four-way output is?

Cassete-type register

Exhaust fan

Duct

Diffuser

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A cooling tower is located at?

Parapet

Basement

Pump Room

Roof Deck

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The condenser of a split type air conditioner is best place on?

Roof

at Roof Deck

Outside of a Building adjacent to the evaporator

Inside the building placed at AHU room

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

a T&B laid out in one wall is considered?

Economical

Less problematic in installation

Functionally interrelated

None of the above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The installation of certain parts (CWL roughing-in) of the plumbing system is done before installation of the?

Structural system

Sanitary roughing-in

Electrical roughing-in

Mechanical roughing-in

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?