pp7 Central Heating Pipework Installation Quiz
Authored by jon May
Physics
Professional Development
Used 8+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
13 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the maximum depth of notch for joists spanning a distance of 2.2m and are 150mm deep?
25mm
18.75mm
30mm
12.5mm
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Between what distances from the wall may drilling of the joist take place? ( joist has a 2 metre span )
0.5m (500mm) and 0.8m (800mm)
0.4m (400mm) and 0.7m (700mm)
0.3m (300mm) and 0.6m (600mm)
0.6m (600mm) and 0.9m (900mm)
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the material used more for pipework in commercial and industrial installations?
Low carbon steel (LCS)
Polybutylene
Copper
Plastic uPVC
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary purpose of insulation for pipes?
To increase heat transfer
To prevent freezing and heat loss
To reduce pressure
To increase noise transmission
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the coefficient of expansion for copper pipework?
0.000016
0.00018
0.000029
0.000011
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
the primary circuit for the heating and hot water should be insulated whenever it passes outside the heated living space?
True
False
Not mentioned
Partially true
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the common tool used for a pump installation?
Electric pipe freezing kit
Adjustable pump pliers
Radiator bleed key
Wide jaw adjustable spanner
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?