pp7 Central Heating Pipework Installation Quiz

pp7 Central Heating Pipework Installation Quiz

Professional Development

13 Qs

quiz-placeholder

Similar activities

MECANICA

MECANICA

1st Grade - Professional Development

15 Qs

Metrologia

Metrologia

Professional Development

10 Qs

SINGLE PHASE INDUCTION MOTOR

SINGLE PHASE INDUCTION MOTOR

Professional Development

15 Qs

Aviation

Aviation

KG - Professional Development

15 Qs

M5.12 Electrostatic Sensitive Devices Cat A

M5.12 Electrostatic Sensitive Devices Cat A

Professional Development

17 Qs

Dinamika Newton

Dinamika Newton

Professional Development

15 Qs

Sanchay Par Advantage

Sanchay Par Advantage

Professional Development

10 Qs

Quantum Mechanics_Activity I

Quantum Mechanics_Activity I

Professional Development

15 Qs

pp7 Central Heating Pipework Installation Quiz

pp7 Central Heating Pipework Installation Quiz

Assessment

Quiz

Physics

Professional Development

Practice Problem

Hard

Created by

jon May

Used 6+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

13 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum depth of notch for joists spanning a distance of 2.2m and are 150mm deep?

25mm

18.75mm

30mm

12.5mm

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Between what distances from the wall may drilling of the joist take place? ( joist has a 2 metre span )

0.5m (500mm) and 0.8m (800mm)

0.4m (400mm) and 0.7m (700mm)

0.3m (300mm) and 0.6m (600mm)

0.6m (600mm) and 0.9m (900mm)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the material used more for pipework in commercial and industrial installations?

Low carbon steel (LCS)

Polybutylene

Copper

Plastic uPVC

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of insulation for pipes?

To increase heat transfer

To prevent freezing and heat loss

To reduce pressure

To increase noise transmission

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the coefficient of expansion for copper pipework?

0.000016

0.00018

0.000029

0.000011

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the primary circuit for the heating and hot water should be insulated whenever it passes outside the heated living space?

True

False

Not mentioned

Partially true

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the common tool used for a pump installation?

Electric pipe freezing kit

Adjustable pump pliers

Radiator bleed key

Wide jaw adjustable spanner

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?