A surveying instructor sent out six groups of students to measure a distance between two points on the ground. The students came up with the following six different values: 150.52, 150.35, 150.89, 150.02, 150.98 and 150.78. Assuming these values are equally reliable and that variations results from accidental errors, determine the most probable value of the distance measured.
Beat the Clock 4 (MSTE)

Quiz
•
Mathematics
•
Professional Development
•
Hard

Godfrey Correa
Used 3+ times
FREE Resource
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
150.49
150.59
150.69
150.79
2.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
Estimate the actual bucket load in bank cubic meters for loader bucket whose heaped capacity is 3.82 m3. The soil's bucket fill factor is 0.9 and its load factor is 0.8.
1.75 BCM
2.75 BCM
3.75 BCM
4.75 BCM
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Initially, the number of bacteria present in a culture is No. At t = 1 hour the number of bacteria is measured to be 3/2 No. If the rate of growth is assumed to be proportional to the number of bacteria present, determine the time necessary for the number of bacteria to triple.
1.7 hrs
2.7 hrs
3.7 hrs
4.7 hrs
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The distance between the entrance and exit points on a horizontal circular roadway curve is 747 ft. The radius of the curve is 400 ft. Determine the central angle between the entrance and exit points.
107 deg
117 deg
127 deg
137 deg
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
It is known that 80 percent of all families won a television set. If 10 families are interviewed at random, find the probability that 7 families own a television set.
0.102
0.120
0.201
0.210
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The probability that a freshman entering a university will graduate after a four-year program is 0.6. If 1000 students enroll at university, find the standard deviation of the number of students who graduated.
15.49
15.94
51.49
51.94
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Megan is a recent civil engineering graduate. One of her first job is to calculate a bridge cost using the following data. The first cost will be $49,000, the annual operating costs for energy and maintenance will be $15,000, the expected life in 10 years, the expected salvage value is 0 and the firm's interest rate is 9%. What is EAC?
$22.6k
$26.2k
$26.6k
$22.2k
Create a free account and access millions of resources
Similar Resources on Quizizz
15 questions
Raciocínio lógico Matemática

Quiz
•
Professional Development
23 questions
Latihan OSN Matematika SD

Quiz
•
Professional Development
15 questions
Quiz aritmatika social

Quiz
•
Professional Development
15 questions
MATERIAL TESTING LABORATORY VIVA

Quiz
•
KG - Professional Dev...
15 questions
SKD 2022

Quiz
•
Professional Development
20 questions
Soal Tes Calon Guru Matematika SMA Nasional

Quiz
•
Professional Development
20 questions
SOAL MATEMATIKA II-BIMBEL BINTARA POLRI

Quiz
•
Professional Development
15 questions
Perbandingan Sederhana

Quiz
•
Professional Development
Popular Resources on Quizizz
15 questions
Multiplication Facts

Quiz
•
4th Grade
25 questions
SS Combined Advisory Quiz

Quiz
•
6th - 8th Grade
40 questions
Week 4 Student In Class Practice Set

Quiz
•
9th - 12th Grade
40 questions
SOL: ILE DNA Tech, Gen, Evol 2025

Quiz
•
9th - 12th Grade
20 questions
NC Universities (R2H)

Quiz
•
9th - 12th Grade
15 questions
June Review Quiz

Quiz
•
Professional Development
20 questions
Congruent and Similar Triangles

Quiz
•
8th Grade
25 questions
Triangle Inequalities

Quiz
•
10th - 12th Grade