Beat the Clock 4 (MSTE)

Beat the Clock 4 (MSTE)

Professional Development

20 Qs

quiz-placeholder

Similar activities

Elapsed Time 1/31/25

Elapsed Time 1/31/25

Professional Development

20 Qs

Hard Math Test

Hard Math Test

4th Grade - Professional Development

16 Qs

MATEMATIKA

MATEMATIKA

KG - Professional Development

20 Qs

Pipes and cistern

Pipes and cistern

10th Grade - Professional Development

20 Qs

TUGAS MAT 1 (By Siti Zulaikah/Lika)

TUGAS MAT 1 (By Siti Zulaikah/Lika)

12th Grade - Professional Development

20 Qs

FOR SPDCSS GROUP STUDY

FOR SPDCSS GROUP STUDY

Professional Development

20 Qs

Unit 4 review (Math)

Unit 4 review (Math)

Professional Development

20 Qs

SCA Scrum Quiz

SCA Scrum Quiz

Professional Development

20 Qs

Beat the Clock 4 (MSTE)

Beat the Clock 4 (MSTE)

Assessment

Quiz

Mathematics

Professional Development

Hard

Created by

Godfrey Correa

Used 3+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A surveying instructor sent out six groups of students to measure a distance between two points on the ground. The students came up with the following six different values: 150.52, 150.35, 150.89, 150.02, 150.98 and 150.78. Assuming these values are equally reliable and that variations results from accidental errors, determine the most probable value of the distance measured.

150.49

150.59

150.69

150.79

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Estimate the actual bucket load in bank cubic meters for loader bucket whose heaped capacity is 3.82 m3. The soil's bucket fill factor is 0.9 and its load factor is 0.8.

1.75 BCM

2.75 BCM

3.75 BCM

4.75 BCM

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Initially, the number of bacteria present in a culture is No. At t = 1 hour the number of bacteria is measured to be 3/2 No. If the rate of growth is assumed to be proportional to the number of bacteria present, determine the time necessary for the number of bacteria to triple.

1.7 hrs

2.7 hrs

3.7 hrs

4.7 hrs

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The distance between the entrance and exit points on a horizontal circular roadway curve is 747 ft. The radius of the curve is 400 ft. Determine the central angle between the entrance and exit points.

107 deg

117 deg

127 deg

137 deg

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

It is known that 80 percent of all families won a television set. If 10 families are interviewed at random, find the probability that 7 families own a television set.

0.102

0.120

0.201

0.210

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The probability that a freshman entering a university will graduate after a four-year program is 0.6. If 1000 students enroll at university, find the standard deviation of the number of students who graduated.

15.49

15.94

51.49

51.94

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Megan is a recent civil engineering graduate. One of her first job is to calculate a bridge cost using the following data. The first cost will be $49,000, the annual operating costs for energy and maintenance will be $15,000, the expected life in 10 years, the expected salvage value is 0 and the firm's interest rate is 9%. What is EAC?

$22.6k

$26.2k

$26.6k

$22.2k

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?