Unit 2.3 Exam 2024

Unit 2.3 Exam 2024

10th Grade

25 Qs

quiz-placeholder

Similar activities

Revit Architecture Exam I

Revit Architecture Exam I

10th - 12th Grade

20 Qs

Architecture EXAM 2

Architecture EXAM 2

9th - 12th Grade

20 Qs

Anna and Friends' Nature Adventure Quiz

Anna and Friends' Nature Adventure Quiz

9th Grade - University

20 Qs

Ariana's Social Studies 1

Ariana's Social Studies 1

4th Grade - University

22 Qs

Digital Art Imagaing 2 Week 7 Unit 3 Review

Digital Art Imagaing 2 Week 7 Unit 3 Review

9th - 12th Grade

23 Qs

Mechanical Drawing - 1.1.2.

Mechanical Drawing - 1.1.2.

8th - 12th Grade

25 Qs

Legend of Zelda

Legend of Zelda

KG - 12th Grade

20 Qs

2.04 Apply Procedures to Single-View Residential Space

2.04 Apply Procedures to Single-View Residential Space

9th - 12th Grade

20 Qs

Unit 2.3 Exam 2024

Unit 2.3 Exam 2024

Assessment

Quiz

Architecture

10th Grade

Practice Problem

Easy

Created by

Danielle DiGravio

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When you are designing a sewer lateral from a residential structure to a city sewer system, which of the following factors is LEAST important?

Sewer lateral slope

Soil type

Pipe size

Pipe depth

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An architect is designing a house for a client. The client is asking for the following in their floor plan:

  • 1. A central living room around which other rooms are centered

  • 2. The master bedroom should be located next to the guest bedroom with separate bathrooms

  • 3. The garage should be located away from bedrooms

  • 4. The living room should lead directly to the porch

Which bubble diagram below best meets the needs of the client?

Media Image
Media Image
Media Image
Media Image

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which method is the best way to reduce rainwater runoff after the site is developed?

add a concrete driveway

add a bioretention garden

add a patio in the backyard

add an awning to the house

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The developers used a new distributor for components in each home. They provided you a list of the components to check in your inspection.

For the component below, determine whether it is used in plumbing systems, electrical systems, or both.

FIXTURES

Plumbing

Electrical

Both

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The developers used a new distributor for components in each home. They provided you a list of the components to check in your inspection.

For the component below, determine whether it is used in plumbing systems, electrical systems, or both.

LIGHTING

Plumbing

Electrical

Both

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The developers used a new distributor for components in each home. They provided you a list of the components to check in your inspection.

For the component below, determine whether it is used in plumbing systems, electrical systems, or both.

METERS

Plumbing

Electrical

Both

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The developers used a new distributor for components in each home. They provided you a list of the components to check in your inspection.

For the component below, determine whether it is used in plumbing systems, electrical systems, or both.

PIPES

Plumbing

Electrical

Both

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?