POB1-Sources of information used in construction

POB1-Sources of information used in construction

Professional Development

27 Qs

quiz-placeholder

Similar activities

MB 800 - Business Central - Microsoft Dynamics

MB 800 - Business Central - Microsoft Dynamics

Professional Development

25 Qs

Present Simple and Present Continuous

Present Simple and Present Continuous

Professional Development

25 Qs

Entrepreneurship In Education

Entrepreneurship In Education

Professional Development

25 Qs

AR Super User Post Test

AR Super User Post Test

Professional Development

30 Qs

Non-Negotiable Heros and Villans

Non-Negotiable Heros and Villans

University - Professional Development

29 Qs

Google Certified Educator Level 2 Quiz part1

Google Certified Educator Level 2 Quiz part1

Professional Development

23 Qs

Power point presentation

Power point presentation

3rd Grade - Professional Development

27 Qs

prepare-4_6-7

prepare-4_6-7

3rd Grade - Professional Development

28 Qs

POB1-Sources of information used in construction

POB1-Sources of information used in construction

Assessment

Quiz

Education

Professional Development

Medium

Created by

Alexandru Pavel

Used 38+ times

FREE Resource

27 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Many different sources of information are used in the construction industry to make sure that things are built accurately, safely and according to :

Council Regulations

Building Regulations.

Local Planning Regulations

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

The sources of information used in construction are as follows:

Drawings and Building Regulations

Specifications and Schedules

Programme of Work

Construction Magazine Daily

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Technical drawing need to meet the criteria set out by :

British Standards

Building Regulations

HSE

Local Council

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Technical drawings are done by:

Engineers

Designers

Architects

Labourers

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The primary work completed in a building before the walls and ceilings are plastered, such as installing windows, door frames and stairs is called:

Second Fix

First Fix

Addendum

Third Fix

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Carpentry work completed after the walls and ceilings have been plastered, such as installing skirting, architraves and doors is called:

First Fix

Second Fix

Addendum

Third Fix

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

True or False: Working drawings are referred to when calculating costs and the quantity of materials required for producing work.

True

False

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?