POB1-Sources of information used in construction

POB1-Sources of information used in construction

Professional Development

27 Qs

quiz-placeholder

Similar activities

Animal Digestive Systems Quiz

Animal Digestive Systems Quiz

KG - Professional Development

22 Qs

are you ready for a rabbit?

are you ready for a rabbit?

KG - Professional Development

22 Qs

Young Driver Removal

Young Driver Removal

Professional Development

23 Qs

Vial Education Quiz

Vial Education Quiz

9th Grade - Professional Development

23 Qs

Induksi K3L General

Induksi K3L General

Professional Development

25 Qs

BCS Network Security Test 8

BCS Network Security Test 8

University - Professional Development

22 Qs

Independence day of India quiz

Independence day of India quiz

KG - Professional Development

22 Qs

Wintersport Quiz

Wintersport Quiz

Professional Development

22 Qs

POB1-Sources of information used in construction

POB1-Sources of information used in construction

Assessment

Quiz

Education

Professional Development

Practice Problem

Medium

Created by

Alexandru Pavel

Used 38+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

27 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Many different sources of information are used in the construction industry to make sure that things are built accurately, safely and according to :

Council Regulations

Building Regulations.

Local Planning Regulations

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

The sources of information used in construction are as follows:

Drawings and Building Regulations

Specifications and Schedules

Programme of Work

Construction Magazine Daily

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Technical drawing need to meet the criteria set out by :

British Standards

Building Regulations

HSE

Local Council

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Technical drawings are done by:

Engineers

Designers

Architects

Labourers

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The primary work completed in a building before the walls and ceilings are plastered, such as installing windows, door frames and stairs is called:

Second Fix

First Fix

Addendum

Third Fix

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Carpentry work completed after the walls and ceilings have been plastered, such as installing skirting, architraves and doors is called:

First Fix

Second Fix

Addendum

Third Fix

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

True or False: Working drawings are referred to when calculating costs and the quantity of materials required for producing work.

True

False

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?