Project Management Quiz

Project Management Quiz

University

7 Qs

quiz-placeholder

Similar activities

Video Games

Video Games

5th Grade - Professional Development

11 Qs

QUIZ 1 - DIM 1013 (INTRODUCTION TO MULTIMEDIA)

QUIZ 1 - DIM 1013 (INTRODUCTION TO MULTIMEDIA)

University

10 Qs

Engineering Graphics and Design

Engineering Graphics and Design

University

10 Qs

Quiz 1 Applied Ergonomic

Quiz 1 Applied Ergonomic

University

12 Qs

CorelDraw Basics -By Ilyas P

CorelDraw Basics -By Ilyas P

4th Grade - Professional Development

11 Qs

DYL10243: TOPIC 3.2 L.H figures in Malaysia & globally

DYL10243: TOPIC 3.2 L.H figures in Malaysia & globally

University

10 Qs

Rapid Prototyping PSMZA

Rapid Prototyping PSMZA

University

11 Qs

2nd challenge

2nd challenge

University

10 Qs

Project Management Quiz

Project Management Quiz

Assessment

Quiz

Design

University

Practice Problem

Hard

Created by

Drielly Fernandes

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the next step after finishing the project scope?

Estimate resources

Define activities

Sequence activities

Develop schedule

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the main purpose of developing a project schedule?

To communicate project results to stakeholders

To create a detailed plan for project execution

To track project progress and performance

To allocate resources to project activities

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the purpose of developing a diagram of precedence?

To illustrate activity sequences and interdependencies

To define activities

To estimate resources

To sequence activities

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the rule for developing the network diagram?

The network must be flexible with no specific rules

Each activity must have a unique identification number

Loops and conditionals are allowed

The flow of the network is from right to left

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the purpose of identifying the critical path in a project schedule?

To identify activities with slack

To identify activities with leads

To determine the maximum time required to complete the project

To analyze the impact of variations in activities

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the main reason for reducing the duration of a project?

To reduce the project budget

To meet the project deadline

To increase the scope of the project

To improve the quality of the project

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the technique used to reduce the project duration without changing the scope?

Resource leveling

PERT analysis

Fast tracking

Critical path method

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?