
Screed Unit 223

Quiz
•
Specialty
•
12th Grade
•
Medium
Nick Dowd
Used 2+ times
FREE Resource
11 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What 2 materials are needed to make a screed
Sand and Cement
Sand and lime
Lime and Cement
Sand, cement and waterproofer
Answer explanation
To make a screed, the primary materials required are sand and cement. These components create a strong and durable mixture, essential for leveling surfaces in construction.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of sand should be used for floor screeds?
Sharp sand
Beach sand
Sliver sand
Wet sand
Answer explanation
Sharp sand is the ideal choice for floor screeds due to its angular grains, which provide better bonding and strength. Other types like beach sand or sliver sand do not offer the same structural integrity.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the name of the tool in the image?
Plastering Trowel
Flooring Trowel
Flooring Float
Pointed Trowel
Answer explanation
The tool in the image is a Flooring Trowel, which is specifically designed for spreading and smoothing flooring materials. Unlike other trowels, it has a wider blade suited for flooring applications.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which document will tell you the required thickness of the floor?
Specification
Risk Assessment
Method statement
On the back of a bag of cement
Answer explanation
The specification outlines the required thickness of the floor, detailing material and construction standards. Other documents like risk assessments and method statements do not provide specific thickness requirements.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Before you rule off the screeds you must do what to the floor mix?
Compact it
Leave it set for an hour
Nothing
Check it has the right amount of sand in it
Answer explanation
Before ruling off the screeds, you must compact the floor mix to ensure it is stable and properly set. This step is crucial for achieving a solid foundation.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How do we calculate floor screed
Area
Height
Volume
Linear
Answer explanation
To calculate floor screed, we need to determine the volume, which is found by multiplying the area by the height. Therefore, the correct choice is 'Volume'.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a major hazard of using cement
Itches
Cause a rash
trips
Burns
Answer explanation
Cement can cause chemical burns due to its alkaline nature. When it comes into contact with skin, it can lead to severe irritation and burns, making 'Burns' the major hazard associated with its use.
Create a free account and access millions of resources
Similar Resources on Wayground
Popular Resources on Wayground
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
10 questions
Nouns, nouns, nouns

Quiz
•
3rd Grade
10 questions
9/11 Experience and Reflections

Interactive video
•
10th - 12th Grade
25 questions
Multiplication Facts

Quiz
•
5th Grade
11 questions
All about me

Quiz
•
Professional Development
22 questions
Adding Integers

Quiz
•
6th Grade
15 questions
Subtracting Integers

Quiz
•
7th Grade
9 questions
Tips & Tricks

Lesson
•
6th - 8th Grade