1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Phase 1 in the Project Life Cycle?

planning

initiating

closing

starting

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A list of prioritized tasks for a sprint within a project

product backlog

project scope

scope creep

5 K

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

a project that contains elements of both predictive and adaptive approaches

predictive

adaptive

waterfall

hybrid

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The unauthorized addition to a project, causing a project to possibly take longer and cost more

scope creep

gold plating

slipping

backlog

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

a project with a well defined scope that is not subject to change

predictive

adaptive

hybrid

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

a project that can have a lot of change requests

predictive

adaptive

hybrid

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

a project with a mixture of structure and variance

predictive

adaptive

hybrid

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?