PV S Ch12 Maintance&Troubleshoooting

Authored by Kevon Kirton

Physics

12th Grade

NGSS covered

Used 4+ times

PV S Ch12 Maintance&Troubleshoooting
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

13 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Commissioning is the initial start-up and operation of a PV system.

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The electrical inspector will make sure that the building codes adopted by the local government are being followed.

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Conductor insulation on PV systems should be rated for wet locations.

True

False

Tags

NGSS.HS-PS2-5

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The last item to check when performing the final check is signage.

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Stand-alone PV systems will require less maintenance than grid-tie systems.

True

False

6.

FILL IN THE BLANK QUESTION

1 min • 1 pt

The organization, office, or individual designated by the local government with legal powers to administer, interpret, and enforce building codes is called the ________________.

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

A maintenance ________________ is a list of maintenance tasks and their suggested time interval.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?