
SPLE Rule 7 NBCP
Authored by N A
Architecture
12th Grade
Used 10+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Minimum thickness of CMU Wall with 2 hours Fire resistive rating
300mm
250mm
200mm
150mm
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Minimum thickness of CMU Wall with 1 hours Fire resistive rating
300mm
250mm
200mm
150mm
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Identify the occupancy of the proposed Project:
Mental Hospital
Group D
Group A
Group B
Group C
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Identify the occupancy of the proposed Project:
Reformatories
Group D
Group A
Group B
Group C
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Identify the occupancy of the proposed Project:
Day-care
Group D
Group A
Group B
Group C
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Identify the occupancy of the proposed Project:
Assembly building less than 1000 occupant
Group J
Group K
Group H
Group I
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Identify the occupancy of the proposed Project:
Assembly building more than 1000 occupant
Group J
Group K
Group H
Group I
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?