cold water 3 revision

cold water 3 revision

Professional Development

18 Qs

quiz-placeholder

Similar activities

Phase 2 revision 3

Phase 2 revision 3

Professional Development

20 Qs

plumbing question revision

plumbing question revision

Professional Development

23 Qs

GMJ 6035 showers work sheet

GMJ 6035 showers work sheet

Professional Development

18 Qs

Phase 2 revision 1

Phase 2 revision 1

Professional Development

20 Qs

GMJ 9189 Phase 1 Unit 305

GMJ 9189 Phase 1 Unit 305

Professional Development

18 Qs

hot water 1-3 revision

hot water 1-3 revision

Professional Development

15 Qs

PLUMBING UTILITIES 3 - WATER DISTRIBUTION

PLUMBING UTILITIES 3 - WATER DISTRIBUTION

Professional Development

15 Qs

Plumbing

Plumbing

Professional Development

15 Qs

cold water 3 revision

cold water 3 revision

Assessment

Quiz

Other

Professional Development

Medium

Created by

Musa Khan

Used 25+ times

FREE Resource

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. What is the maximum depth a water main service pipe should be laid at?

c. 1,350mm
a. 500mm
b. 900mm
d. 2,000mm

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. Fluid category 1 represents:

a.    A serious health risk

b.    A significant health risk

c.     A slight health risk

d.    No health risk.

b
d
a
c

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. Which one of the following water pipes connects the local main to the water undertaker’s stop valve?

c. The feed pipe
b. The communication pipe
d. The service pipe.
a. The distribution pipe

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. A cold water storage cistern base must be supported:

a. Over the whole of its base
c. By using chipboard
d. Over the majority of its base
b. Over at least three bearers

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. Which one of the following back flow prevention devices must be installed on a supply to a hose union bib tap, according to the Water Regulations?

a. AUK 2 air gap
b. Single check valve
d. Double check valve
c. Fullway gate vale

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. The plastic medium density supply pipe, which is blue, is manufactured from which of the following materials?

b. Polybutylene.

c. PVC
a. Polyethylene

d. Polystyrene

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. The Water Regulations state that a mixer tap which allows the hot and cold water to mix in the body of the tap with unbalanced pressures must have:

c. AUK 2 air gap
b. Single check valve of both hot and cold supplies
d. AUK 3 air gap
a. Double check valve on both hot and cold supplies

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?