1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of an Initial Verification?

To confirm an installation is safe to be put into service

To complete the testing and issue an Electrical Installation Certificate

To ensure all testing has been carried out

To make a judgement that the installation is safe for continued use

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What situation requires the issuing of a Minor Electrical Installation Works Certificate?

An additional lighting circuit has been installed

Additional socket-outlets added to an existing ring final circuit

Changing a consumer unit and protective devices

Upgrading the cable and circuit breaker for a shower circuit

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which statutory document contains specific information relevant to Initial Verification?

Health and Safety guidance GS38

The Electricity at Work Regulations

BS 7671, Requirements for Electrical Installations

The Health and Safety at Work Act

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum voltage which requires the test leads and probes to comply with GS38?

120 V AC

25 V AC

50 V AC

150 V AC

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many voltage measurements are required to confirm that a three-phase four-wire installation is safely isolated?

9

10

6

3

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What precaution is required before carrying out a test of external earth fault loop impedance (Ze) so as to avoid danger to users of an installation?

Lock off the supply

Disconnect the main protective bonding conductors

Use insulated screwdrivers

Warn the occupier of the premises

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why does BS 7671 require inspection to be carried out before testing?

To confirm the Earthing Conductor is connected and it is safe to commence testing

To confirm the installers have installed as per the job specification

To confirm the installation is complete and it is safe to commence testing

To confirm all the equipment is connected to the installation will work

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?