1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a member of the site management team?

Marketing Manager

Contracts Manager

IT Specialist

Human Resources Officer

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which professional is in charge of managing costs and contracts related to the construction?

Structural Engineer

Surveyor

Quantity Surveyor

Contracts Manager

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Identify the role that is NOT part of the site management team.

Health & Safety Inspector

Building Services Engineer

Project Manager/Clerk of Works

Financial Advisor

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary responsibility of the 'Building Control Officer' in the site management team?

Designing the building's structure

Ensuring the building meets regulatory standards

Managing the construction site

Purchasing materials for construction

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is considered the most important person in a construction project as they are the reason the project is going ahead?

The architect

The clerk of works

The client

The structural engineer

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of the architect in a construction project?

To ensure the building is constructed according to the drawings

To calculate loads, forces, and variances from wind and rain

To convert the client's ideas and requirements into a building design and working drawings

To position the building on the land and ensure that Building Regulations are followed

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary responsibility of the clerk of works (project manager)?

To design the project

To ensure the building is constructed according to the drawings and check the standard of work and quality of materials.

To calculate structural safety

To resolve difficulties and problems during the construction process

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?