6035DRPPT1Q2

6035DRPPT1Q2

12th Grade

18 Qs

quiz-placeholder

Similar activities

Onshape Basics

Onshape Basics

6th - 12th Grade

17 Qs

World Heritage Sites

World Heritage Sites

11th Grade - University

20 Qs

The Drill #1

The Drill #1

11th - 12th Grade

20 Qs

Concrete

Concrete

11th Grade - Professional Development

20 Qs

Architect Dictums, Quotes, Philosophies - 01

Architect Dictums, Quotes, Philosophies - 01

7th Grade - Professional Development

15 Qs

Places of Eminence- Sources of History

Places of Eminence- Sources of History

8th Grade - University

17 Qs

My house

My house

1st - 12th Grade

13 Qs

6035DRPPT1Q2

6035DRPPT1Q2

Assessment

Quiz

Architecture

12th Grade

Practice Problem

Hard

Created by

William Heron

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be positioned just above ground level at the base of a soil stack?

a) Ventilation grill

b) Pressure gauge

c) Roding access

d) Trap seal

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is vertical distance of pipes to prevent crossflow?

200mm

150mm

250mm

300mm

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the consequence of crossflow in a primary ventilated stack?

a) Increased trap seal

b) Reduced effluent flow

c) Trap seal loss and effluent crossflow

d) Improved ventilation

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What feature does a parallel junction include to facilitate maintenance?

a) Roding access

b) Trap seal

c) Ventilation grill

d) Pressure gauge

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum pipe size recommended if multiple appliances are connected to a single discharge pipe in a primary ventilated stack?

a) 25mm

b) 32mm

c) 40mm

d) 50mm

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the self-cleaning velocity in a primary ventilated stack?

a) To increase blockage risk

b) To reduce blockage risk

c) To slow down the flow of liquid

d) To reduce the velocity of solids

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is installed at the base of a soil stack to maintain effluent velocity during directional changes?

a) Long radius bend

b) 90-degree bend

c) Short radius bend

d) Coupling

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?