Search Header Logo

PC EXAM

Authored by Jollibee Karangalan Imelda

Other

Professional Development

Used 3+ times

PC  EXAM
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

_______ is the advance shift in production to anticipate hourly charge of demand.

PCS guide

Product control

 Transition time

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

________ is the thermostat setting of the food warmer

140 C

 140 F

at least 130 F

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When wiping the exterior of the food warmer we remove the ______ first before the side and front panel

Top cover

Bottom cover

back cover

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

TRUE or FALSE. turn on the Lamp switch on 15 minutes before the store opens

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What version of PCS Guide currently is in use?

4.1

4.2

4.3

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Ensure minimal to ____ left over products during closing

maximum

Zero

over

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Turn off the fan switch ____ minutes after turning of the power switch

10 minutes

5 minutes

15 minutes

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?