
Day 1 - PM (BU)
Authored by JuLes Bosque
Architecture
University

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
62 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What pipe material is used by MWSS for the service pipe?
Pressure Pipe
PVC
ABS
HDPE
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
These are vertical tracks that guide the car and the counterweights.
Guide Rails
Passenger Elevator
Service Elevator
Dumbwaiter
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What do you call the hoist way of an elevator?
Guide Rail
Lift
Conveyor
Shaft
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What pipe material is recommended for the cold water line?
ABS
uPVC
LDPE
cPVC
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
It turns the sheave that lifts and lowers the car.
Control Panel
Elevator Machine
Elevator Pit
Buffer
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the recommended size for the ¾ T&B for the kids?
1.20sqm
2.50sqm
2.16sqm
3.00sqm
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where will the Transformer Vault be located?
Ground Floor
Basement
Mezzanine Floor
Roof Deck
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?