MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What pipe material is used by MWSS for the service pipe?

Pressure Pipe

PVC

ABS

HDPE

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

These are vertical tracks that guide the car and the counterweights.

Guide Rails

Passenger Elevator

Service Elevator

Dumbwaiter

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What do you call the hoist way of an elevator?

Guide Rail

Lift

Conveyor

Shaft

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What pipe material is recommended for the cold water line?

ABS

uPVC

LDPE

cPVC

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It turns the sheave that lifts and lowers the car.

Control Panel

Elevator Machine

Elevator Pit

Buffer

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended size for the ¾ T&B for the kids?

1.20sqm

2.50sqm

2.16sqm

3.00sqm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where will the Transformer Vault be located?

Ground Floor

Basement

Mezzanine Floor

Roof Deck

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?