Search Header Logo

Day 1 - PM (BU)

Authored by JuLes Bosque

Architecture

University

Day 1 - PM (BU)
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

62 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What pipe material is used by MWSS for the service pipe?

Pressure Pipe

PVC

ABS

HDPE

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

These are vertical tracks that guide the car and the counterweights.

Guide Rails

Passenger Elevator

Service Elevator

Dumbwaiter

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What do you call the hoist way of an elevator?

Guide Rail

Lift

Conveyor

Shaft

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What pipe material is recommended for the cold water line?

ABS

uPVC

LDPE

cPVC

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It turns the sheave that lifts and lowers the car.

Control Panel

Elevator Machine

Elevator Pit

Buffer

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended size for the ¾ T&B for the kids?

1.20sqm

2.50sqm

2.16sqm

3.00sqm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where will the Transformer Vault be located?

Ground Floor

Basement

Mezzanine Floor

Roof Deck

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?