Testing Central Heating Systems - CHECK OF LEARNING

Testing Central Heating Systems - CHECK OF LEARNING

12th Grade

29 Qs

quiz-placeholder

Similar activities

Sp. 4 Ch. 2 Desafio 2

Sp. 4 Ch. 2 Desafio 2

9th - 12th Grade

27 Qs

Intake and exhaust systems

Intake and exhaust systems

10th - 12th Grade

25 Qs

Electrical - Module 12 - Electrical Test Equipment

Electrical - Module 12 - Electrical Test Equipment

12th Grade

24 Qs

Chapter 15: Diagnostic Procedures and Pharmacology

Chapter 15: Diagnostic Procedures and Pharmacology

9th - 12th Grade

25 Qs

Cooling and Fuel Systems

Cooling and Fuel Systems

9th - 12th Grade

25 Qs

KNOWLEDGE TEST - Autocare Technician (ST0499/AP01)

KNOWLEDGE TEST - Autocare Technician (ST0499/AP01)

12th Grade

29 Qs

IT16 - Engine Service 1

IT16 - Engine Service 1

12th Grade

25 Qs

Aftertreatment

Aftertreatment

9th - 12th Grade

25 Qs

Testing Central Heating Systems - CHECK OF LEARNING

Testing Central Heating Systems - CHECK OF LEARNING

Assessment

Quiz

Other

12th Grade

Medium

Created by

Adam Dreifuss

Used 6+ times

FREE Resource

29 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the code of practice for the treatment of water in domestic hot water central heating systems known as?

BS 14336:2004

BS 7593

BS EN 14336:2004

BS EN 7593

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which step comes immediately after the 'Cold flush' when testing central heating?

Soundness Test

Cleanse system (BS 7593)

Hot flush

Fill system (inhibitor)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in the heating system testing procedure ?

Hot flush

Fill system (inhibitor)

System check

Soundness Test

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in preparing a hydraulic pressure test according to the document?

Open all valves in the test section.

Blank, plug or seal all open ends.

Check that all high points have vents.

Remove and/or blank off vulnerable items.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done with the valves in the test section during the preparation for a hydraulic pressure test?

Close all valves in the test section.

Open all valves in the test section.

Remove all valves in the test section.

Check all valves for leaks.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the general formula for determining the system test pressure in plumbing?

Test pressure = Operating pressure + 1.5 bar

Test pressure = Operating pressure x 1.5

Test pressure = Operating pressure / 1.5

Test pressure = Operating pressure - 1.5 bar

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a sealed system has an operating pressure of 1 bar, what would be the acceptable test pressure?

0.5 bar

1 bar

1.5 bar

2 bar

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?