Cannock EIC Quiz

Quiz
•
Other
•
Professional Development
•
Medium
Paul Hussey
Used 8+ times
FREE Resource
17 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
Under what condition are you permitted to photocopy or electronically manipulate the IET forms according to the document?
For any purpose as long as it is free of charge.
Solely in connection with your electrical contracting business.
For the purpose of resale.
Without any conditions as long as the IET logo is not reproduced.
2.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
How long does the permission to use the IET forms last before it needs to be considered for renewal?
After five years from the date hereof.
After seven years from the date hereof.
After ten years from the date hereof.
It does not expire and does not need renewal.
3.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
Which of the following is NOT included in the Electrical Installation Certificate ?
Details of client
Schedule of Circuit Details
Schedule of Test Results
Electrical Maintenance Log
4.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
What is the purpose of the 'Schedule of Inspections' section in the Electrical Installation Certificate?
To record the maximum demand of the installation
To list the names and addresses of the signatories
To document the inspection outcomes of various parts of the installation
To provide the details of the installation earthing
5.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
Which of the following is NOT a type of earthing arrangement listed in the Electrical Installation Certificate?
TN-C
TT
IT
TN-B
6.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
What information is required under the 'Main switch / Switch-fuse / Circuit-breaker / RCD' section?
Location, BS (EN) number, and number of poles
Current rating, fuse/device rating or setting, and voltage rating
Type of earthing electrode and electrode resistance to Earth
Maximum demand in kVA/Amps and details of installation Earth Electrode
7.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
Which of the following is a characteristic that may be included under 'Nature of Supply Parameters' in the Electrical Installation Certificate?
Prospective fault current, Ipf
Rated residual operating current
Measured operating time
Connection / continuity verified
Create a free account and access millions of resources
Similar Resources on Wayground
20 questions
Capstone Revision 1

Quiz
•
Professional Development
20 questions
ICIT Revision D

Quiz
•
Professional Development
15 questions
9. Special Precautions for Track Maintenance in Electrified Area

Quiz
•
Professional Development
20 questions
Mr. Phillips Wise Review 3

Quiz
•
11th Grade - Professi...
15 questions
Electrical Work and Safety Quiz PH pt1

Quiz
•
Professional Development
20 questions
electrical safety

Quiz
•
Professional Development
20 questions
ITI Electrician

Quiz
•
Professional Development
20 questions
FLIGHT PLANNING for PPL (REMEDIAL)

Quiz
•
Professional Development
Popular Resources on Wayground
18 questions
Writing Launch Day 1

Lesson
•
3rd Grade
11 questions
Hallway & Bathroom Expectations

Quiz
•
6th - 8th Grade
11 questions
Standard Response Protocol

Quiz
•
6th - 8th Grade
40 questions
Algebra Review Topics

Quiz
•
9th - 12th Grade
4 questions
Exit Ticket 7/29

Quiz
•
8th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
19 questions
Handbook Overview

Lesson
•
9th - 12th Grade
20 questions
Subject-Verb Agreement

Quiz
•
9th Grade