Class 8 (Ch#3) IT Project Management

Class 8 (Ch#3) IT Project Management

8th Grade

20 Qs

quiz-placeholder

Similar activities

Stuchell Photoshop ACA - Setting Project Requirements

Stuchell Photoshop ACA - Setting Project Requirements

6th - 11th Grade

22 Qs

Unpuzzled ASCII

Unpuzzled ASCII

7th - 12th Grade

15 Qs

CKY I TIN 9

CKY I TIN 9

6th - 8th Grade

18 Qs

kiểm tra tin 8

kiểm tra tin 8

8th Grade

20 Qs

Basic Docs

Basic Docs

8th - 9th Grade

17 Qs

Robotic /coding exam

Robotic /coding exam

6th - 8th Grade

16 Qs

CÂU HỎI ÔN TAP HKI

CÂU HỎI ÔN TAP HKI

5th Grade - University

21 Qs

XI TEKNOLOGI JARINGAN BERBASIS LUAS (WAN) Ke 1

XI TEKNOLOGI JARINGAN BERBASIS LUAS (WAN) Ke 1

1st - 10th Grade

20 Qs

Class 8 (Ch#3) IT Project Management

Class 8 (Ch#3) IT Project Management

Assessment

Quiz

Computers

8th Grade

Practice Problem

Hard

Created by

Syed Ahmed

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The Agile method emphasizes:

A) Detailed planning upfront

B) Adherence to a fixed sequence of steps

C) Flexibility and adaptability

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which method allows for regular adjustments and changes throughout the project?

A) Waterfall

B) Agile

C) Hybrid

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

In the Waterfall method, when are changes typically made to the project?

A) Throughout the entire process

B) During the Design/Plan phase

C) After the Test phase

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

In the Critical Path method, what is the primary focus?

A) Managing risks

B) Completing tasks simultaneously

C) Identifying the longest sequence of dependent tasks

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which project management method focuses on completing tasks in parallel rather than sequentially?

A) Waterfall

B) Agile

C) Hybrid

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The Hybrid method combines aspects of which two project management methodologies?

A) Waterfall and Agile

B) Agile and Critical Path

C) Waterfall and Critical Path

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which method involves building upon iterative cycles of planning, executing, and evaluating?

A) Waterfall

B) Agile

C) Hybrid

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?