Class 8 (Ch#3) IT Project Management

Class 8 (Ch#3) IT Project Management

8th Grade

20 Qs

quiz-placeholder

Similar activities

Computer Networks

Computer Networks

8th Grade

20 Qs

Introduction to Computer Networks

Introduction to Computer Networks

8th Grade

20 Qs

Coding basics

Coding basics

4th - 12th Grade

22 Qs

Project: 3 Producing and Implementing

Project: 3 Producing and Implementing

7th - 12th Grade

25 Qs

Pengembangan Perangkat Lunak

Pengembangan Perangkat Lunak

1st - 10th Grade

15 Qs

Software Development Methodologies Quiz

Software Development Methodologies Quiz

8th Grade

18 Qs

Systems Development -Test-and Student Report Card

Systems Development -Test-and Student Report Card

8th Grade

15 Qs

PowerPoint Review

PowerPoint Review

6th - 8th Grade

21 Qs

Class 8 (Ch#3) IT Project Management

Class 8 (Ch#3) IT Project Management

Assessment

Quiz

Computers

8th Grade

Hard

Created by

Syed Ahmed

Used 1+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The Agile method emphasizes:

A) Detailed planning upfront

B) Adherence to a fixed sequence of steps

C) Flexibility and adaptability

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which method allows for regular adjustments and changes throughout the project?

A) Waterfall

B) Agile

C) Hybrid

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

In the Waterfall method, when are changes typically made to the project?

A) Throughout the entire process

B) During the Design/Plan phase

C) After the Test phase

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

In the Critical Path method, what is the primary focus?

A) Managing risks

B) Completing tasks simultaneously

C) Identifying the longest sequence of dependent tasks

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which project management method focuses on completing tasks in parallel rather than sequentially?

A) Waterfall

B) Agile

C) Hybrid

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The Hybrid method combines aspects of which two project management methodologies?

A) Waterfall and Agile

B) Agile and Critical Path

C) Waterfall and Critical Path

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which method involves building upon iterative cycles of planning, executing, and evaluating?

A) Waterfall

B) Agile

C) Hybrid

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?