
CIS 4355 exam 1 review
Authored by AT Karr
Computers
University
Used 17+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
70 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What does the %C/A(percent complete and accurate) metric measure in technology value system?
The speed of code deployment
The quality of output at each step
Customer Satisfaction
Lead time efficiency
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
How is the DevOps ideal of achieving deployment lead times of minutes primarily accomplished?
By tightly coupling applications
By relying on manual testing
By continuously checking small code changes into version control and automating testing and deployment
By performing exploratory testing
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What characterizes the second phase of work in the technology value stream?
Sequential processing of large batches of work
Near-Zero defects and low creativity,
Long and unpredictable lead times
High variability of process time and high uncertainty
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What is the value stream in the context of Lean Manufacturing?
A.The sequence of activities to deliver upon a customer request
B. The sequence of activities to design a product
C. The sequence of activities to clean the factory floor
D. the sequence of activities to hire new employees
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What does the focus on deployment lead time entail in dev Ops?
A. Ensure a smooth and even flow of work,
B. Reducing the role of IT operations
C. Minimizing the use of version control
D. Maximizing security and compliance failures
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
At what point does the technology value stream typically begin in DevOps?
A. when the business hypothesis is formulated
B. When the application is running in production
C. When QA and testing are initiated
D.When the code is checked into version control
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following is not a technique used to create a smooth flow of work in manufacturing value streams?
A. Reducing work in Process
B.Small batch sizes
C. Continuous system optimization
D. Increasing rework
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?