Emerging-technologies

Emerging-technologies

12th Grade

78 Qs

quiz-placeholder

Similar activities

Olimpiade Bhs Indonesia

Olimpiade Bhs Indonesia

9th Grade - University

75 Qs

Japanese nihon lanka academy test quiz

Japanese nihon lanka academy test quiz

1st Grade - University

75 Qs

BAHASA INDONESIA

BAHASA INDONESIA

12th Grade

81 Qs

Recap Lesson 1  Element 5

Recap Lesson 1 Element 5

12th Grade

78 Qs

mọi sai lầm đều phải trả giá

mọi sai lầm đều phải trả giá

9th - 12th Grade

76 Qs

Ôn Tập Tiếng Anh 12

Ôn Tập Tiếng Anh 12

12th Grade

80 Qs

Module 4 Vocab

Module 4 Vocab

9th Grade - University

83 Qs

Emerging-technologies

Emerging-technologies

Assessment

Quiz

Education

12th Grade

Medium

Created by

Robert Cogbill

Used 8+ times

FREE Resource

78 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Building Information Modelling (BIM)?

A 2D drawing-based process

A 3D model-based process

A physical model construction method

A traditional building technique

Answer explanation

Building Information Modelling (BIM) is a 3D model-based process, not a 2D drawing-based process, physical model construction method, or traditional building technique.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of using BIM in construction?

To reduce the need for collaboration

To increase construction time

To allow design and construction teams to collaborate efficiently

To eliminate the need for design

Answer explanation

Using BIM in construction allows design and construction teams to collaborate efficiently, improving communication and coordination throughout the project.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a stage in the BIM process?

Plan

Design

Build

Demolish

Answer explanation

Demolish is NOT a stage in the BIM process as it involves the destruction of a structure, not part of the typical BIM workflow which focuses on planning, designing, and building.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Level 3 BIM indicate?

No collaboration, using 2D CAD and working with drawings

Using 3D CAD for drafting production information

All parties use 3D CAD models and share information through a common file format

All parties use one shared 3D model, easily accessible to all

Answer explanation

Level 3 BIM indicates that all parties use one shared 3D model, easily accessible to all, promoting collaboration and efficiency in the construction process.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is an emerging technology mentioned in the construction material?

Blockchain

Quantum Computing

Virtual Reality (VR)

Artificial Intelligence (AI)

Answer explanation

The correct choice is Virtual Reality (VR) as an emerging technology mentioned in the construction material.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does AR stand for in the context of construction technologies?

Augmented Reality

Automated Robotics

Advanced Rendering

Architectural Rendering

Answer explanation

AR stands for Augmented Reality in the context of construction technologies.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is an example of an emerging technology in construction?

3D printing of buildings

Traditional bricklaying

Manual drafting

Wooden scaffolding

Answer explanation

3D printing of buildings is an example of an emerging technology in construction, making it the correct choice among the options provided.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?