9189PH2CWPPT3Q1

9189PH2CWPPT3Q1

12th Grade

34 Qs

quiz-placeholder

Similar activities

9189PH2SANPPT2Q1

9189PH2SANPPT2Q1

12th Grade

36 Qs

SPLE Rule 1-6 NBCP

SPLE Rule 1-6 NBCP

12th Grade

37 Qs

6035DRPPT1Q1

6035DRPPT1Q1

12th Grade

35 Qs

6035DRPPT4Q1

6035DRPPT4Q1

12th Grade

35 Qs

Construction Materials Quiz

Construction Materials Quiz

12th Grade

32 Qs

8202L3HWPPT7Q2

8202L3HWPPT7Q2

12th Grade

39 Qs

8202L3SANPPT2Q2

8202L3SANPPT2Q2

12th Grade

29 Qs

CPAR Quiz 2

CPAR Quiz 2

12th Grade

35 Qs

9189PH2CWPPT3Q1

9189PH2CWPPT3Q1

Assessment

Quiz

Architecture

12th Grade

Medium

Created by

William Heron

Used 1+ times

FREE Resource

34 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing cold water pipework, what should be taken into account to prevent problems related to frost and heat?

Pipework should be positioned near heat sources.

Pipework should be buried in walls or floors without access.

Pipework should be avoided in positions where frost and heat could cause a problem.

Pipework should be openly displayed in living areas.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where should pipework ideally be positioned in a property?

In plain sight within main living spaces.

Out of eyesight and boxed in where appropriate.

Only in outside walls and unheated roof spaces.

In frequently used pathways for easy access.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before installing cold water pipework, why is it important to "walk the job"?

To find the nearest coffee shop

To estimate the cost of pipework

To plan the routes that the pipework will take

To meet the customer's neighbors

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to ensure that existing system controls are accounted for before installing new pipework?

Turn off all the valves

Paint the valves

Locate relevant valves

Replace all valves

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a necessary step to take when preparing for pipework installation that involves the floor?

Polishing the floorboards

Lifting floorboards temporarily

Permanently removing floorboards

Ignoring the floorboards

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is "marking out" an important step in the preparation for installing pipework?

To decorate the installation area

To indicate where to paint

To mark the locations of electrical outlets

To indicate pipework routes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to protect the customer's property during the installation of pipework?

Sell the property

Cover or move the customer's property

Leave the property as it is

Insure the property

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?