9189PH2CWPPT3Q1

9189PH2CWPPT3Q1

12th Grade

34 Qs

quiz-placeholder

Similar activities

MATH GEOMETRY (GRADE 9 3RD QUARTER)

MATH GEOMETRY (GRADE 9 3RD QUARTER)

9th - 12th Grade

33 Qs

AutoCAD Pre/Post Test

AutoCAD Pre/Post Test

9th - 12th Grade

35 Qs

Technical Sketching Review

Technical Sketching Review

9th - 12th Grade

36 Qs

Geo Benchmark #2 Review

Geo Benchmark #2 Review

1st Grade - University

34 Qs

Family & Consumer Science:  2.05 Sample Questions

Family & Consumer Science: 2.05 Sample Questions

9th - 12th Grade

30 Qs

Grade 12 Christmas Theory Exam 2024

Grade 12 Christmas Theory Exam 2024

12th Grade

30 Qs

Hand Tool Identification Quiz

Hand Tool Identification Quiz

11th - 12th Grade

33 Qs

Construction Math

Construction Math

9th - 12th Grade

30 Qs

9189PH2CWPPT3Q1

9189PH2CWPPT3Q1

Assessment

Quiz

Architecture

12th Grade

Practice Problem

Medium

Created by

William Heron

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

34 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing cold water pipework, what should be taken into account to prevent problems related to frost and heat?

Pipework should be positioned near heat sources.

Pipework should be buried in walls or floors without access.

Pipework should be avoided in positions where frost and heat could cause a problem.

Pipework should be openly displayed in living areas.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where should pipework ideally be positioned in a property?

In plain sight within main living spaces.

Out of eyesight and boxed in where appropriate.

Only in outside walls and unheated roof spaces.

In frequently used pathways for easy access.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before installing cold water pipework, why is it important to "walk the job"?

To find the nearest coffee shop

To estimate the cost of pipework

To plan the routes that the pipework will take

To meet the customer's neighbors

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to ensure that existing system controls are accounted for before installing new pipework?

Turn off all the valves

Paint the valves

Locate relevant valves

Replace all valves

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a necessary step to take when preparing for pipework installation that involves the floor?

Polishing the floorboards

Lifting floorboards temporarily

Permanently removing floorboards

Ignoring the floorboards

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is "marking out" an important step in the preparation for installing pipework?

To decorate the installation area

To indicate where to paint

To mark the locations of electrical outlets

To indicate pipework routes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to protect the customer's property during the installation of pipework?

Sell the property

Cover or move the customer's property

Leave the property as it is

Insure the property

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?