1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is the primary advantage of Throwaway Prototyping?

Allows for early user feedback and identification of design flaws

Reduces the need for detailed analysis and design documentation

Well-suited for projects with short timeframes

Ideal for ensuring a highly reliable system

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What type of project is best suited for Agile development methodologies?

Projects with clearly defined requirements and a long timeframe

Projects requiring a high degree of user involvement

Projects with limited technical expertise

Projects with a high focus on detailed documentation

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

When selecting a development methodology, what factor should be given the most weight?

The project manager's preference

The availability of funding for the project

The specific characteristics of the project

The software development tools being used

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is one of the greatest strengths of systems consulting firms for project estimation?

Access to a wider range of project management tools

Experience and pre-developed methodologies for estimation

Ability to assign highly skilled developers to the project

Extensive knowledge of the latest software development trends

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is a limitation of the simple method for estimating project time based on the planning phase?

It does not account for the complexity of the project

It requires specialized software to perform the calculations

It is only applicable to Waterfall development methodologies

It cannot be used for projects with a short planning phase

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Why might a project manager choose iterative development over Waterfall development?

To reduce the risk of overlooking important requirements

To ensure a high degree of system reliability from the start

To minimize the need for user involvement throughout the project

To simplify the documentation process

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is the key benefit of using Rapid Application Development (RAD)?

Increased focus on testing throughout the development process

Ability to develop a system quickly and get user feedback early

Well-suited for projects with complex requirements

Ensures a high level of system reliability

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?