IS210 - Midterm Quiz

IS210 - Midterm Quiz

University

20 Qs

quiz-placeholder

Similar activities

SE2 (LEC) Week 1-2 Project Management Essentials

SE2 (LEC) Week 1-2 Project Management Essentials

University

21 Qs

First Quiz - CS326C

First Quiz - CS326C

University

15 Qs

Software Engineering

Software Engineering

University

20 Qs

Software  Engineering Test 1

Software Engineering Test 1

University

20 Qs

SDLC

SDLC

University

15 Qs

Fundamentals of Software Engineering

Fundamentals of Software Engineering

University

15 Qs

BCA (H) ASD Quiz 1

BCA (H) ASD Quiz 1

University

20 Qs

Quiz #1 - ISA111

Quiz #1 - ISA111

University

15 Qs

IS210 - Midterm Quiz

IS210 - Midterm Quiz

Assessment

Quiz

Computers

University

Hard

Created by

Andy Durante

Used 3+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is the primary advantage of Throwaway Prototyping?

Allows for early user feedback and identification of design flaws

Reduces the need for detailed analysis and design documentation

Well-suited for projects with short timeframes

Ideal for ensuring a highly reliable system

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What type of project is best suited for Agile development methodologies?

Projects with clearly defined requirements and a long timeframe

Projects requiring a high degree of user involvement

Projects with limited technical expertise

Projects with a high focus on detailed documentation

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

When selecting a development methodology, what factor should be given the most weight?

The project manager's preference

The availability of funding for the project

The specific characteristics of the project

The software development tools being used

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is one of the greatest strengths of systems consulting firms for project estimation?

Access to a wider range of project management tools

Experience and pre-developed methodologies for estimation

Ability to assign highly skilled developers to the project

Extensive knowledge of the latest software development trends

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is a limitation of the simple method for estimating project time based on the planning phase?

It does not account for the complexity of the project

It requires specialized software to perform the calculations

It is only applicable to Waterfall development methodologies

It cannot be used for projects with a short planning phase

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Why might a project manager choose iterative development over Waterfall development?

To reduce the risk of overlooking important requirements

To ensure a high degree of system reliability from the start

To minimize the need for user involvement throughout the project

To simplify the documentation process

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is the key benefit of using Rapid Application Development (RAD)?

Increased focus on testing throughout the development process

Ability to develop a system quickly and get user feedback early

Well-suited for projects with complex requirements

Ensures a high level of system reliability

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?