Chapter 2 Post-Assessment

Chapter 2 Post-Assessment

19 Qs

quiz-placeholder

Similar activities

 GCE1: Digital Citizenship

GCE1: Digital Citizenship

KG - University

17 Qs

Spelling Quiz: Words with 'oo' Sounds

Spelling Quiz: Words with 'oo' Sounds

1st - 5th Grade

20 Qs

Endothermic and exothermic reaction

Endothermic and exothermic reaction

KG - University

20 Qs

Lincoln movie quiz

Lincoln movie quiz

11th Grade

20 Qs

Unit 1 Energy Conversions

Unit 1 Energy Conversions

KG - University

19 Qs

Roots 3-4 Quiz

Roots 3-4 Quiz

5th Grade

15 Qs

Ancient Belief Systems & World Religions Quiz

Ancient Belief Systems & World Religions Quiz

6th Grade

20 Qs

Chapter 2 Post-Assessment

Chapter 2 Post-Assessment

Assessment

Quiz

others

Practice Problem

Easy

Created by

Briana Talley

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

19 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

The sequence of activities that represents the longest path through a project, which determines the shortest possible duration, is the __________.

Critical Path
Acceptance Criteria
Decomposition
Dependencies
Discretionary

2.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

__________ are factors or tasks that rely on the input of another factor for their timeline, stability and efficiency.

Dependencies
Acceptance Criteria
Critical Path
Decomposition
Discretionary

3.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables is the __________.

Work Breakdown Structure (WBS)
Acceptance Criteria
Critical Path
Decomposition
Dependencies

4.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

__________ is the process of determining all the requirements of a project. There are two main types of project requirements: business and technical requirements.

Requirements Gathering
Acceptance Criteria
Critical Path
Decomposition
Dependencies

5.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

A __________ is a tool that shows the logical relationships between the activities in a project schedule graphically.

Network Logic Diagram
Acceptance Criteria
Critical Path
Decomposition
Dependencies

6.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

A set of conditions that is required to be met before deliverables are accepted is the __________.

Acceptance Criteria
Critical Path
Decomposition
Dependencies
Discretionary

7.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

The work defined at the lowest level of the work breakdown structure for which cost and duration are estimated and managed is the __________.

Work Package
Acceptance Criteria
Critical Path
Decomposition
Dependencies

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?