Chapter 2 Post-Assessment

Chapter 2 Post-Assessment

19 Qs

quiz-placeholder

Similar activities

TICKET OUT 3/23

TICKET OUT 3/23

KG - University

16 Qs

Clients

Clients

11th Grade

16 Qs

Refraction of Light and Total Internal Reflection Quiz

Refraction of Light and Total Internal Reflection Quiz

KG - University

15 Qs

Vocab Set #2: Scientific Concepts 2

Vocab Set #2: Scientific Concepts 2

7th Grade

14 Qs

WOW! - ILLUSTRATOR DRAWING TOOLS

WOW! - ILLUSTRATOR DRAWING TOOLS

KG - University

20 Qs

CE142_LEC4_Scope Management

CE142_LEC4_Scope Management

KG - University

20 Qs

Chapter 2 Post-Assessment

Chapter 2 Post-Assessment

Assessment

Quiz

others

Easy

Created by

Briana Talley

Used 1+ times

FREE Resource

19 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

The sequence of activities that represents the longest path through a project, which determines the shortest possible duration, is the __________.
Critical Path
Acceptance Criteria
Decomposition
Dependencies
Discretionary

2.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

__________ are factors or tasks that rely on the input of another factor for their timeline, stability and efficiency.
Dependencies
Acceptance Criteria
Critical Path
Decomposition
Discretionary

3.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables is the __________.
Work Breakdown Structure (WBS)
Acceptance Criteria
Critical Path
Decomposition
Dependencies

4.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

__________ is the process of determining all the requirements of a project. There are two main types of project requirements: business and technical requirements.
Requirements Gathering
Acceptance Criteria
Critical Path
Decomposition
Dependencies

5.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

A __________ is a tool that shows the logical relationships between the activities in a project schedule graphically.
Network Logic Diagram
Acceptance Criteria
Critical Path
Decomposition
Dependencies

6.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

A set of conditions that is required to be met before deliverables are accepted is the __________.
Acceptance Criteria
Critical Path
Decomposition
Dependencies
Discretionary

7.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

The work defined at the lowest level of the work breakdown structure for which cost and duration are estimated and managed is the __________.
Work Package
Acceptance Criteria
Critical Path
Decomposition
Dependencies

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?