1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Single flying shore should have a depth of not less than __________ of the clear span and width of not less than __________ of its length
1/8, 1/9
3/9, 3/8
1/3, 1/5
1/2, 1/1

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum period for the removal of props to beams and arches for a span of 6m in centering / form work?
10 Days
14 Days
17 Days
20 Days

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the approximate depth of vertical sheeting adopted in timbering in soft ground?
10m
12m
15m
17m

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the distance between the (in single row) standards in single scaffolding?
2.0 m
1.7 m
1.5 m
1.2 m

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the depth of trench while box sheeting carried out in timbering in loose soil?
4 m
5 m
5.5 m
6 m

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum suitable distance between the two adjacent parallel walls for single flying shore?
5 m
9 m
15 m
18 m

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The method of timbering of trenches used for supporting the sides of soft ground of depth not exceeding 10m and providing an offset at the end of the each stage is
Box sheeting
Stay bracing
Vertical sheeting
Runner system

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Similar Resources on Quizizz