Program Design, Testing Methods, Test Planning, and Maintenance

Program Design, Testing Methods, Test Planning, and Maintenance

12th Grade

15 Qs

quiz-placeholder

Similar activities

Software Testing Life Cycle

Software Testing Life Cycle

12th Grade

15 Qs

Software Development Terms

Software Development Terms

9th - 12th Grade

10 Qs

SDLC

SDLC

9th - 12th Grade

15 Qs

Intro to Web Authoring SDLC Quiz

Intro to Web Authoring SDLC Quiz

12th Grade

13 Qs

Software Development Models

Software Development Models

10th - 12th Grade

17 Qs

Software Development Life Cycle Quiz

Software Development Life Cycle Quiz

12th Grade - University

20 Qs

Unit Test

Unit Test

12th Grade

20 Qs

Waterfall vs Agile SDLC - Multiple Choice Questions (MCQs)

Waterfall vs Agile SDLC - Multiple Choice Questions (MCQs)

12th Grade - University

10 Qs

Program Design, Testing Methods, Test Planning, and Maintenance

Program Design, Testing Methods, Test Planning, and Maintenance

Assessment

Quiz

Computers

12th Grade

Hard

Created by

Harvey Greener

Used 1+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of test data includes inputs that are likely to cause the program to fail?

Normal data

Abnormal data

Extreme/boundary data

All of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which software development model is best suited for projects with rapidly changing requirements and a need for quick iterations?

Waterfall model

Iterative model

Rapid Application Development (RAD) model

Spiral model

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the waterfall model, when does the testing phase typically occur?

Before the design phase

After the implementation phase

Concurrently with the design phase

After the requirements phase

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a test strategy in software development?

To define the process for correcting errors in the code.

To outline the overall approach to testing and quality assurance.

To specify the exact test data to be used in each test case.

None of the above.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In which testing method is the tester unaware of the internal structure of the code being tested?

Dry run testing

Walkthrough testing

White-box testing

Black-box testing

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a primary advantage of the Rapid Application Development (RAD) model?

It ensures a thorough and detailed analysis of requirements upfront.

It allows for quick development and frequent user involvement.

It requires minimal user involvement throughout the development process.

It follows a strict sequential approach similar to the waterfall model.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key characteristic of the iterative model?

It emphasizes thorough planning and documentation upfront.

It allows for rapid development and frequent feedback from stakeholders.

It follows a linear sequence of phases without the possibility of revisiting previous stages.

It focuses on delivering a fully functional product in a single release.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?