1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the basis for determining and controlling the project budget?

Estimating cost

Project scheduling

Resource allocation

Quality assurance

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which project estimation process involves finalizing the project budget first?

Top-Down Estimation

Bottom-Up Estimation

Parametric Estimation

Analogous Estimation

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which estimating technique is based on the previous project to estimate for a new project?

Bottom-Up Estimation

Analogous Estimation

Top-Down Estimation

Parametric Estimation

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the formula for the Three-Point Estimation technique?

a- best scenario

b- normal scenario

c - worst scenario

(a + b + c) / 2

(a + b + c) / 4

(a + b + c) / 3

(a + b + c) / 5

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which estimating technique is known for being very detailed in nature?

Top-Down Estimation

Bottom-Up Estimation

Analogous Estimation

Parametric Estimation

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is an advantage of the Parametric Estimation technique?

Detailed estimation

Higher accuracy

Based on repeatable tasks

Quick and simple

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a disadvantage of the Analogous Estimation technique?

Two projects can never be exactly the same

Gives maximum accuracy

Based on repeatable tasks

Quick and simple

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a disadvantage of the Three-Point Estimation technique?

Based on probability

Gives maximum accuracy

Gives realistic estimates

Complicated technique for complex projects