What is the purpose of a Site Waste Management Plan (SWMP)?

To document employee attendance on site

To outline the construction project timeline

To increase the amount of waste for landfill

To monitor and control waste produced on a construction project

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Since what year is an SWMP no longer a legal requirement?

2010

2014

2005

2018

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary goal of the waste management hierarchy?

To prioritize landfill use

To reduce, reuse, and recycle waste before disposing of it

To follow legal protocols only

To increase waste production

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT listed as a benefit of waste management?

Compliance with regulations

Reduced costs

Increased accidents

Improved reputation

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What types of waste must be kept separate from general waste streams for safety reasons?

Wood and glass

Soil and stones

Concrete and bricks

Paints and varnishes

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is required for each load of non-hazardous waste?

A landfill permit

A waste transfer note

A recycling certificate

A construction approval

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should not be covered by skips on a construction site?

Unused land

Drains or manholes

Gravel paths

Grass areas

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?