Process Unit Shutdown 2/3

Passage
•
Professional Development
•
12th Grade
•
Hard
Quizizz Content
FREE Resource
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a critical path in the planned work event?
A sequence that is irrelevant to other work
A sequence that may delay other work if not completed
A sequence that is not important in the planned work event
A sequence that is always completed first
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of purging with an inert gas after draining hydrocarbons from piping and vessels?
To remove any remaining hydrocarbons and prevent explosions
To introduce more hydrocarbons into the vessels
To increase the pressure inside the vessels
To cool down the equipment
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be done before allowing entry into vessels during shutdown?
Check the temperature of the vessels
Check the color of the vessels
Check the pressure of the vessels
Check vessels daily for LEL
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be done to prevent pump seal damage during product pump out?
Increase the speed of the pumps
Shutdown mechanical seal pumps immediately before liquid levels are depleted
Allow the pumps to run dry
Use the pumps continuously
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be done when shutting down furnace fires to prevent a firebox explosion?
Leave the firebox open
Close the master valve and keep the burner lighted
Open all valves and turn off the burner
Increase the fuel flow
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be done before steam purging to prevent equipment damage?
Introduce more water into the equipment
Increase the pressure inside the equipment
Drain all water from water-cooled heat exchanger and open the vent
Close all vents
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the main purpose of securing equipment during unit clear up?
To prevent accidents and equipment damage
To increase the temperature inside the equipment
To speed up the shutdown process
To allow more feed into the equipment
Create a free account and access millions of resources
Similar Resources on Wayground
11 questions
BSBWHS520 Manage implementation of emergency procedures

Passage
•
Professional Development
11 questions
Video Production Studio Safety Quiz - Multiple Choice

Passage
•
12th Grade
11 questions
unit 5 lesson 6

Passage
•
12th Grade
15 questions
Health and Safety Responsibilities Quiz

Passage
•
12th Grade
6 questions
Risk Assessment and Management in Occupational Safety

Passage
•
11th Grade
11 questions
Machinery and Equipment Safety Quiz

Passage
•
12th Grade
11 questions
Hierarchy of risk control

Passage
•
11th Grade
16 questions
Process Unit Shutdown 3/3

Passage
•
12th Grade
Popular Resources on Wayground
50 questions
Trivia 7/25

Quiz
•
12th Grade
11 questions
Standard Response Protocol

Quiz
•
6th - 8th Grade
11 questions
Negative Exponents

Quiz
•
7th - 8th Grade
12 questions
Exponent Expressions

Quiz
•
6th Grade
4 questions
Exit Ticket 7/29

Quiz
•
8th Grade
20 questions
Subject-Verb Agreement

Quiz
•
9th Grade
20 questions
One Step Equations All Operations

Quiz
•
6th - 7th Grade
18 questions
"A Quilt of a Country"

Quiz
•
9th Grade