CONSTRUCTION 1

CONSTRUCTION 1

Professional Development

β€’

20 Qs

quiz-placeholder

Similar activities

Vehicle Wiring Diagrams and Fault Diagnosis Quiz Level 3

Vehicle Wiring Diagrams and Fault Diagnosis Quiz Level 3

Professional Development

β€’

15 Qs

3. BABYMONSTER quiz by π—΄π—Άπ˜κ―­π—΅Χ‚π°Χ…πŸŽ€ @𝗯ׄ𝝰𝗲𝗺ิׅ𝝾Ϋͺ𝗻𝝰𝗿𝗲𝝰

3. BABYMONSTER quiz by π—΄π—Άπ˜κ―­π—΅Χ‚π°Χ…πŸŽ€ @𝗯ׄ𝝰𝗲𝗺ิׅ𝝾Ϋͺ𝗻𝝰𝗿𝗲𝝰

Professional Development

β€’

20 Qs

Coffee Academy Level 300: Origin and Ethical Sourcing 2

Coffee Academy Level 300: Origin and Ethical Sourcing 2

Professional Development

β€’

20 Qs

Introduction to AI tools (IAI)

Introduction to AI tools (IAI)

Professional Development

β€’

15 Qs

Test 1 A1

Test 1 A1

Professional Development

β€’

20 Qs

Survey of Philippine Literature in English

Survey of Philippine Literature in English

Professional Development

β€’

20 Qs

The Ultimate Wrong Answer Quiz

The Ultimate Wrong Answer Quiz

Professional Development

β€’

21 Qs

Light Vehicle Engine Systems unit 152 Level 2

Light Vehicle Engine Systems unit 152 Level 2

Professional Development

β€’

15 Qs

CONSTRUCTION 1

CONSTRUCTION 1

Assessment

Quiz

β€’

Others

β€’

Professional Development

β€’

Easy

Created by

Danica Shane Pandes

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec β€’ 1 pt

Includes such as activities as specification development, process control, product acceptance, laboratory and technician certification, training, and communication.

Construction Management

Quality Management

Quality Control

Building Construction

2.

MULTIPLE CHOICE QUESTION

30 sec β€’ 1 pt

The maximum volume that can be placed in the bucket without spillage based on a specified angle of repose for the material in the bucket.

Heaped Volume

Waterline Capacity

Struck Capacity

Dragline

3.

MULTIPLE CHOICE QUESTION

30 sec β€’ 1 pt

The process of increasing the density of a soil by mechanically forcing the soil particles closer together, thereby expelling air from the void spaces in the soil.

Dynamic Compaction

Vibratory Compaction

Compaction

Surcharging

4.

MULTIPLE CHOICE QUESTION

30 sec β€’ 1 pt

Placing of additional weight on the soil surface, has long been used to densify cohesive soils.

Dynamic Compaction

Vibratory Compaction

Compaction

Surcharging

5.

MULTIPLE CHOICE QUESTION

30 sec β€’ 1 pt

Represents that component of vehicle weight which acts parallel to an inclined surface.

Rolling Resistance

Grade Resistance

Fixed Time

Variable Time

6.

MULTIPLE CHOICE QUESTION

30 sec β€’ 1 pt

Involves smoothing slopes, shaping ditches, and bringing the earthwork to the elevation required by the plans and specification.

Grading

Finishing

Balancing

Trimming

7.

MULTIPLE CHOICE QUESTION

30 sec β€’ 1 pt

The construction operations involved in the production of concrete include
I. Batching
II. Mixing
III. Transporting
IV. Placing
V. Consolidating
VI. Finishing; and
VII. Curing

I, III, V, and VII only

II, IV, and VI only

I, II, III, IV, and V only

All of the above

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?