CONSTRUCTION 1

CONSTRUCTION 1

Professional Development

20 Qs

quiz-placeholder

Similar activities

Temporary Works Quiz

Temporary Works Quiz

Professional Development

15 Qs

Sedimentary Rocks Quiz

Sedimentary Rocks Quiz

Professional Development

23 Qs

Fundamentals of financial accounting

Fundamentals of financial accounting

Professional Development

15 Qs

Developmental Economics Mid Exan For study

Developmental Economics Mid Exan For study

Professional Development

15 Qs

Art and Design Theory: Marxism

Art and Design Theory: Marxism

Professional Development

15 Qs

Task 1 | MR Training

Task 1 | MR Training

Professional Development

20 Qs

General Dentistry Quiz

General Dentistry Quiz

Professional Development

15 Qs

English Benedictines  -  11.02.2024.

English Benedictines - 11.02.2024.

Professional Development

20 Qs

CONSTRUCTION 1

CONSTRUCTION 1

Assessment

Quiz

Others

Professional Development

Easy

Created by

Danica Shane Pandes

Used 2+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Includes such as activities as specification development, process control, product acceptance, laboratory and technician certification, training, and communication.

Construction Management

Quality Management

Quality Control

Building Construction

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The maximum volume that can be placed in the bucket without spillage based on a specified angle of repose for the material in the bucket.

Heaped Volume

Waterline Capacity

Struck Capacity

Dragline

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The process of increasing the density of a soil by mechanically forcing the soil particles closer together, thereby expelling air from the void spaces in the soil.

Dynamic Compaction

Vibratory Compaction

Compaction

Surcharging

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Placing of additional weight on the soil surface, has long been used to densify cohesive soils.

Dynamic Compaction

Vibratory Compaction

Compaction

Surcharging

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Represents that component of vehicle weight which acts parallel to an inclined surface.

Rolling Resistance

Grade Resistance

Fixed Time

Variable Time

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Involves smoothing slopes, shaping ditches, and bringing the earthwork to the elevation required by the plans and specification.

Grading

Finishing

Balancing

Trimming

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The construction operations involved in the production of concrete include
I. Batching
II. Mixing
III. Transporting
IV. Placing
V. Consolidating
VI. Finishing; and
VII. Curing

I, III, V, and VII only

II, IV, and VI only

I, II, III, IV, and V only

All of the above

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?