Concrete Final Game

Concrete Final Game

University

8 Qs

quiz-placeholder

Similar activities

Elevations

Elevations

11th Grade - Professional Development

10 Qs

Check-On Learning #4

Check-On Learning #4

University

10 Qs

BQS601 INTRODUCTION

BQS601 INTRODUCTION

University

12 Qs

7) Project Management and Filing.

7) Project Management and Filing.

University

10 Qs

Construction Manpower Safety

Construction Manpower Safety

University

10 Qs

TOPIK 1-LANTAI

TOPIK 1-LANTAI

University

10 Qs

Key Players in Construction

Key Players in Construction

University

10 Qs

Time Management in Building Construction

Time Management in Building Construction

University

8 Qs

Concrete Final Game

Concrete Final Game

Assessment

Quiz

Architecture

University

Practice Problem

Hard

Created by

MARC LAU

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

All of these structures were made using recycled concrete, except:

Pixel Building, Melbourne, Australia

One Central Park, Sydney, Australia

The Goods Line, Sydney

The Green Square Library, Australia

2.

FILL IN THE BLANK QUESTION

1 min • 1 pt

These iconic residential and commercial complex has a sustainable and __________ design, including the use of recycled materials in its construction, mainly the use of recycled concrete.

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Benefits of using recycled concrete?

Material Quality

Lower construction cost

conserving resources

Regulatory Compliance

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is recycled concrete used as in structures?

surface finishes

sub-base material

high structural elements

architectural finishing

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The use of recycled concrete needs careful consideration, except:

material quality

structural requirements

regulatory compliance

aggregates usage

6.

FILL IN THE BLANK QUESTION

1 min • 1 pt

The use of recycled concrete in structures and construction presents a viable and ___________ solution for reducing waste, conserving resources, and lowering construction costs.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main factor to consider when using recycled concrete?

Material quality

Structural requirements

Regulatory compliance

Environmental impact

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a common application of recycled concrete in construction?

Surface finishes

Landscaping purposes

Structural beams

Roofing materials