a320 cbt 2

a320 cbt 2

Professional Development

20 Qs

quiz-placeholder

Similar activities

OVH DYNO TEST BENCH - TEST PERFORMANCE

OVH DYNO TEST BENCH - TEST PERFORMANCE

Professional Development

20 Qs

Kaun Banega LG-STP Gyani

Kaun Banega LG-STP Gyani

Professional Development

20 Qs

CLAIMS AWR

CLAIMS AWR

Professional Development

20 Qs

post quiz 21 to 22 aug

post quiz 21 to 22 aug

Professional Development

17 Qs

FITTER 4 TH SEM TT  MONTHLY EXAM JUNE 2021

FITTER 4 TH SEM TT MONTHLY EXAM JUNE 2021

Professional Development

25 Qs

AIR CONDITIONER

AIR CONDITIONER

Professional Development

18 Qs

HEHM

HEHM

Professional Development

20 Qs

Monobloc

Monobloc

Professional Development

20 Qs

a320 cbt 2

a320 cbt 2

Assessment

Quiz

Special Education

Professional Development

Hard

Created by

nusantara aviasi

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

01: Conditioned air is distributed to:
A: Cockpit, cargo bays and cabin
B: Cockpit, fwd and aft cabins
C: Cockpit, avionics bay and cabin
D: Cockpit, cabin and holds 1 and 2 only

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

02: Hot air fault light illuminates on the air conditioning panel
A:  The hot air press. reg. valve opens and the trim air valves close.
B:  The hot air press. reg. valve closes and the trim air valves open.
C: The hot air press. reg. valve closes and the trim air valves close.
D: The hot air press. reg. valve opens and the trim air valves open.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3:Does the trim air provide the warm air or the cold air to the air conditioning system?
A: Cold air
B: Warm air
C : normal air
D : none

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4: In case of zone controller primary and secondary channel failure, what temperatures are maintained by pack one and pack two?
A: 15 deg.C both
B: 25 deg.C both
C: 20 deg.C for pack one and 10 deg.C for pack two
D: 24 deg.C for pack one and 15 deg.C for pack two

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5: In normal flight in closed circuit configuration, the avionics ventilation system controls the temperature of the cooling air by:
A:'Adding air conditioned air to the flow
B: Extracting air overboard
C: Adding avionics bay air
D: Passing air through a skin heat exchanger

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6: To enable Ram air to the mixture unit, The Ram air switch should be used:
A: At any time
B: Only when differential pressure is less than 1 psi.
C: When pressure is greater than 1 psi diff.
D: Only after outflow valve is fully opened

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7: Pack controller, primary channel failure.
A: The secondary computer operates as a backup mode and regulation is not optimized
B: The secondary computer takes over (all functions as normal)
C: Pack is lost
D: Pack outlet temperature is controlled at 15 deg.C

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?