1.

FILL IN THE BLANK

30 sec • 1 pt

It is a schedule of quantities of all the items of work in a building.

2.

FILL IN THE BLANK

1 min • 1 pt

It provides clients of the construction industry with financial, contractual and technical advice ensuring they get value for money from the buildings they construct.

3.

FILL IN THE BLANK

1 min • 1 pt

They are essential to any construction project getting off the ground.

4.

FILL IN THE BLANK

1 min • 1 pt

They measure and estimate building costs and keep the whole project on budget.

building costs and keep the whole project on budget.

5.

FILL IN THE BLANK

1 min • 1 pt

It is defined as the process of calculating the quantities and cost of various items required in connection with the work.

6.

FILL IN THE BLANK

1 min • 1 pt

It is prepared by calculation the quantities from the dimensions on the drawings for the

various items required to complete the project and multiplied by unit cost of the item concerned.

7.

FILL IN THE BLANK

1 min • 1 pt

To prepare this, drawing consisting of the plan, elevation and the sections through

important points, along with a detailed specification giving specific description of

workmanship, properties and proportion of materials are required.

8.

FILL IN THE BLANK

1 min • 1 pt

It is shown as a figure and a unit of measurement behind it.

9.

FILL IN THE BLANK

1 min • 1 pt

It is the cost built up of material cost, wastages,

labor cost, plant/equipment cost and profit and overhead.

A fixed charge, payment or value.

10.

FILL IN THE BLANK

1 min • 1 pt

An estimate how much money will be needed or price to be charged for something.