Piling System Quiz

Piling System Quiz

1st - 3rd Grade

10 Qs

quiz-placeholder

Similar activities

Until loops

Until loops

3rd - 11th Grade

7 Qs

Multiple Meaning Words

Multiple Meaning Words

3rd Grade

11 Qs

Guess the emotion

Guess the emotion

3rd Grade

10 Qs

Lupang Hinirang

Lupang Hinirang

1st - 3rd Grade

15 Qs

How to Eat Fried Worms Chapters 2-5

How to Eat Fried Worms Chapters 2-5

3rd - 5th Grade

10 Qs

Vocabulary Unit 3

Vocabulary Unit 3

2nd Grade

10 Qs

DCQ5083 BWM 4 - Quiz 1

DCQ5083 BWM 4 - Quiz 1

1st - 12th Grade

10 Qs

Reading Comprehension (Fall Season)

Reading Comprehension (Fall Season)

1st - 5th Grade

10 Qs

Piling System Quiz

Piling System Quiz

Assessment

Quiz

Other

1st - 3rd Grade

Hard

Created by

Dayang Afiqah

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The choice of piling techniques depends on the following factors EXCEPT...

Soil conditions

Load capacity

Environmental constraints

Types of pile material

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Displacement piles are commonly used in .......... soil

Gravel

Hard clay

Cohesive

Compacted sand

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The key difference with bored piles compared to driven piles is that bored piles involve the removal and replacement of soil during installation, while driven piles displace the soil as they are hammered into the ground. True or False?

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a permanent casing for Driven / Cast In-Situ Piles?

Consolidate the subsoil around the pile casing

Protect the concrete cast inside the lining against

weak strata of subsoil that might otherwise fall into the

pile excavation

Protects the concrete against contamination

All of the above

None of the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of composite piles?

To overcome environmental constraint

To overcome problems resulting from particular site or ground conditions

To minimize the cost

To maximize the pile strength

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  • This method is suitable where piling is being carried out in close proximity to existing building or where vibration and/or noise is restricted. What is this piling technique?

Displacement

Replacement

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is difficult to monitor the quality of Rotary Bored Piles. True of false?

True

False

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?