1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Categorized as "Greenfield Projects"

development of new transmission facilities

replacement of existing facilities/equipment

development of non-network facilities

the upgrade, expansion, rehabilitation,

restoration, relocation, or replacement of existing facilities/equipment,

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In HVE replacement or uprating, who will be responsible as Lead and Site Management?

SO

O&M

P&E

Non-technical

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This IEC is discussing Module No.

1

3

5

2

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the management of CAPEX, the lead group is responsible for:

a. Monitor BU

b. Prepare regulatory reportorial requirement to ERC and project update reports to DOE

c. preparation of Variation or Contract Time Extension

a and b

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Categorized as "Brownfield Projects"

development of new transmission facilities

replacement of existing facilities/equipment

development of non-network facilities

the upgrade, expansion, rehabilitation,

restoration, relocation, or replacement of existing facilities/equipment,

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is step no. 7 in the critical safety steps for HVE Maintenance?

Proceed with the de-energization of equipment requested for shutdown.

Proceed with the energization sequence

The SEOD shall verify condition and conduct walkdown inspection which includes verification on the removal of grounding cluster.

Clear the area and secure all machines, test equipment and accessories used in the activity.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Alert Bulletin No. 013 is all about

The Dos and Dont's of Switching Operation of PCB

Wiring Issues

PCB Switching Protocol between SEOD and ACC/RCC During Emergency Conditions

Prevention of Human Error Incident in Operating the DS and ES

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?