walang alam

walang alam

6th - 8th Grade

28 Qs

quiz-placeholder

Similar activities

solving inequalities

solving inequalities

8th Grade

23 Qs

Genreal Knowledge

Genreal Knowledge

KG - Professional Development

25 Qs

Understanding Perspectives Task Cards

Understanding Perspectives Task Cards

7th Grade

23 Qs

【七下】U3總複習

【七下】U3總複習

7th Grade

23 Qs

test your inner ARMY 2021-2022

test your inner ARMY 2021-2022

KG - Professional Development

23 Qs

WNBA Facts

WNBA Facts

KG - 10th Grade

23 Qs

7th Grade Reading Goals-Reading Comprehension

7th Grade Reading Goals-Reading Comprehension

6th - 8th Grade

30 Qs

TIP (TES INTELEGENSI PMR) KEPALANGMERAHAN

TIP (TES INTELEGENSI PMR) KEPALANGMERAHAN

7th - 9th Grade

23 Qs

walang alam

walang alam

Assessment

Quiz

Special Education

6th - 8th Grade

Hard

Created by

Hev Abi

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

28 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The difference in elevation between the headwater and tailwater or tailrace.

Dynamic head

Net positive suction head

Gross head

Effective Head

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It conducts the water around the turbine.

Spiral casing

Draft tube

Wicket gate

Governor

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

These are movable vertical vanes that are actuated by the governor to control the flow of water and therefore the energy supplied to the runner

Spillway

Runner

Headrace pipe

Wicket gate

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The rotating part of the turbine where the water imparts its energy onto the turbine shaft.

Runner

Flywheel

Impeller

Lobe

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The power output of this plant depends on the water flow in the river; at low river flows the output decreases accordingly.

Pumped storage plant

Run-of-river plant

Storage plant

all of the above

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It provides an efficient and safe means of releasing flow water that exceeds the design capacity of the dam.

Draft tube

penstock

surge chamber

spillway

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This is a grid of screen composed of parallel bars to catch floating debris. It prevent leaves, branches, and other water contaminants from entering the penstock.

Surge tank

Trash Rack

Butterfly valve

Weir

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?