Tightness Testing and IGEM/UP/1B

Tightness Testing and IGEM/UP/1B

Professional Development

10 Qs

quiz-placeholder

Similar activities

Special Test/ Shoulder

Special Test/ Shoulder

Professional Development

9 Qs

Testing and Lab Procedures

Testing and Lab Procedures

University - Professional Development

15 Qs

ISO 13485:2016  Awareness Assessment 2023

ISO 13485:2016 Awareness Assessment 2023

Professional Development

15 Qs

Phase4mod6tight

Phase4mod6tight

Professional Development

7 Qs

Unsafe Situations (Examples) GIUSP

Unsafe Situations (Examples) GIUSP

Professional Development

12 Qs

Approach to UGIB

Approach to UGIB

Professional Development

10 Qs

ISO/IEC 17025:2017 LMS REQUIREMENTS (PART 1)

ISO/IEC 17025:2017 LMS REQUIREMENTS (PART 1)

Professional Development

10 Qs

Unify Online Assessment

Unify Online Assessment

Professional Development

12 Qs

Tightness Testing and IGEM/UP/1B

Tightness Testing and IGEM/UP/1B

Assessment

Quiz

Science

Professional Development

Hard

Created by

Rob Anderson

Used 9+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum installation volume (IV) that can be worked on as per IGEM/UP/1B?

0.025m3

0.035m3

0.02m3

0.2m3

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum operating pressure (MOP) at the outlet of the emergency control valves (ECV) as per IGEM/UP/1B?


75mb


1bar


2bar


3bar

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum nominal bore for copper pipework as per IGEM/UP/1B?

22mm

28mm


35mm



45mm

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When conducting a let-by test the water within the U gauge raises by more than 0.25mb, what procedure would you follow?


The test would be stopped and ESP called to repair

Disconnect the ECV and spray LDF into the barrel to prove you have let-by.


Move straight onto the tightness test suspected let-by would have no detrimental affect on the test.

Connect temporary bonding across the meter than disconnect the ECV and spray LDF into the barrel to prove let-by before contacting ESP.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

      What is the maximum pressure drop allowed for an existing system with appliances fitted, a G4 meter and 35mm pipework, appliance connected and no smell of gas reported?


4mb

0mb


8mb

2.5mb

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The normal working pressure of a low pressure installation is?

19mb

20mb ± 1mb



21mb ± 2mb


23mb

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the let-by test pressure on both low and medium pressure installations?

12mb

20mb


20-21mb

7-10mb

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?