Prof. Prac. Part 3

Prof. Prac. Part 3

4th Grade

100 Qs

quiz-placeholder

Similar activities

oooo

oooo

1st - 5th Grade

105 Qs

Word Within The Word Lists 1-4

Word Within The Word Lists 1-4

3rd Grade - University

100 Qs

Menbuat soal harian

Menbuat soal harian

1st - 5th Grade

105 Qs

Broadway Study Guide

Broadway Study Guide

1st - 10th Grade

99 Qs

Kuis Pengetahuan Umum

Kuis Pengetahuan Umum

4th Grade

104 Qs

Prof. Prac. Part 4

Prof. Prac. Part 4

4th Grade

100 Qs

Ref. Part 1

Ref. Part 1

4th Grade

100 Qs

art rocks

art rocks

1st - 5th Grade

98 Qs

Prof. Prac. Part 3

Prof. Prac. Part 3

Assessment

Quiz

Arts

4th Grade

Easy

Created by

Kalel Ognita

Used 175+ times

FREE Resource

100 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Recommends the systematic process of

ensuring a building’s array of systems is planned,

designed, installed and tested to perform

according to design intent and building’s

operational needs?

Building Systems Testing

Management Commissioning and Testing

Building Commissioning

Building Acceptance

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Republic Act 9285 is also known as

Architects Dispute Act of 2004

Alternative Dispute Resolution Act of 2004

Mediation Act of 2016

Arbitration Act of 2010

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What government agency implements the

provision of RA 9285?

DOJ

Court of Appeals

CIAC

CAMA

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first phase of the Architects Basic

Services?

Schematic Design Phase

Project Definition Phase

Meet Up Phase

Site Visit Phase

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the final submitted construction cost to the

owner, who prepares the Bill of Quantities (BOQ)?

Architect

Contractor

Construction Manager

Project Manager

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who prepares the Bill of Materials (BOM)?

Architect

Contractor

Construction Manager

Project Manager

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The architect may prepare and come up with

the Project Construction Cost through the

following estimate technique except:

Area Method

Detailed estimate

Volume method

Interest rate method

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?