Cargo Operations Quiz

Cargo Operations Quiz

12th Grade

12 Qs

quiz-placeholder

Similar activities

AE Exam Review unit 1

AE Exam Review unit 1

10th - 12th Grade

10 Qs

Purpose & Function of Aircraft Parts, AS 210, C1 L3

Purpose & Function of Aircraft Parts, AS 210, C1 L3

9th - 12th Grade

10 Qs

Oxy-Fuel Welding and Cutting Quiz

Oxy-Fuel Welding and Cutting Quiz

9th - 12th Grade

11 Qs

Admit, transfer, and discharge patient

Admit, transfer, and discharge patient

12th Grade

16 Qs

Tractor-Trailer Engine Quiz

Tractor-Trailer Engine Quiz

12th Grade

10 Qs

LCL Quiz

LCL Quiz

1st Grade - Professional Development

10 Qs

jets

jets

1st Grade - University

15 Qs

Bankruptcy Quiz

Bankruptcy Quiz

10th - 12th Grade

15 Qs

Cargo Operations Quiz

Cargo Operations Quiz

Assessment

Quiz

Other

12th Grade

Hard

Created by

Priyadarshi Mishra

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of drying in the general cycle of cargo operations?

To lower the temperature of the cargo tank before loading

To remove moisture from cargo tanks and piping system

To cool or heat the cargo to meet specified temperature

To reduce oxygen content in the cargo system

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main reason for inerting the cargo tanks, piping system, and void spaces?

To increase the oxygen content for safety

To reduce the oxygen content to acceptable levels

To speed up the loading process

To prevent flammable atmosphere in the subsequent gassing up operations

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended method for purging the atmosphere within a tank during cargo operations?

Combustion method

Dilution method

Ventilation method

Displacement method

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of gassing up in the cargo operations?

To reduce inert Gas in the cargo tanks with cargo vapour

To remove moisture from the cargo tanks

To reduce oxygen content in the cargo tanks

To increase the pressure in the cargo tanks

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When should pre-cooling be carried out in the cargo operations?

After loading the cargo

Before loading the cargo

During discharge of the cargo

During the voyage

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the process of liquid freeing in the cargo operations?

Draining and stripping the tanks using the stripping pump

Introducing cold Gas followed by liquid cargo into the tanks

Purging the inert Gas out of the cargo tanks

Removing all liquid from the tanks

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done before discharging the cargo according to the text?

Ignore the method of discharging the cargo

Check the cargo tanks temperatures and pressures

Skip the pre-operational ship/shore information exchange

Start the discharge operation immediately

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Other