1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which Building Regulation covers Central Heating

part L

part F

Part J

Part G

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of boiler can meet the demand of both central heating & hot water

Combination

Heat only

Regular

System

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what does F&E stand for

Float and expansion

Feed and expansion

Feed and evaluate

Free and expansion

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is an advantage to a one pipe system

cheap to install

looks nice

doesn't require cleaning and maintenance

each radiator progressively cools down

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is the size of the primary pipework on a 2 pipe system incorporating a back boiler

22mm

28mm

15mm

54mm

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is another name for a semi gravity two pipe system

c plan

s plan

y plan

f plan

7.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

identify which components are needed to be added to the system to make a c plan a c plan plus

zone valve

cylinder stat

TRV's

Room stat

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?