1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which Building Regulation covers Central Heating
part L
part F
Part J
Part G
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which type of boiler can meet the demand of both central heating & hot water
Combination
Heat only
Regular
System
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
what does F&E stand for
Float and expansion
Feed and expansion
Feed and evaluate
Free and expansion
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
what is an advantage to a one pipe system
cheap to install
looks nice
doesn't require cleaning and maintenance
each radiator progressively cools down
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
what is the size of the primary pipework on a 2 pipe system incorporating a back boiler
22mm
28mm
15mm
54mm
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
what is another name for a semi gravity two pipe system
c plan
s plan
y plan
f plan
7.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
identify which components are needed to be added to the system to make a c plan a c plan plus
zone valve
cylinder stat
TRV's
Room stat
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?